Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Malga Piovernetta-Monte Pioverna - 4pers. High speed chairlift (detachable)

All lifts/cable cars Folgaria-Fiorentini

Directly to:

The Folgaria-Fiorentini ski resort almost exclusively features modern quad chairlifts. There is a good balance between detachable (high speed) and fixed-grip (slower) lifts. There are also a few older double and triple chairlifts. In order to ski the entire ski resort in both directions, you must only use one pommel lift in addition to the chairlifts. The other pommel lifts are provided for beginners. There are some people movers which assist with the flat sections in the ski resort as well as some in the beginner and children's areas. There are also two separate toboggan lifts.

Number of ski lifts

  • 22

Total capacity

35900 Passengers/hour

Total lift length

18.2 km Total

17 Chairlift
6 4pers. High speed chairlift (detachable)
6 4pers. Chairlift (fixed-grip)
2 3pers. Chairlift (fixed-grip)
3 2pers. Chairlift (fixed-grip)
5 T-bar lift/platter/button lift
5 J-bar

Other types of ascension mechanisms

8 Sunkid Moving Carpet      Further information about Sunkid

Planned ski lifts

planned: Folgaria-Francollini-Sommo Alto

8pers. Gondola lift (monocable circulating ropeway)
Length: 2500 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

planned: Fondo Piccolo-Sommo Alto

4pers. High speed chairlift (detachable)
Length: 1200 m · Carrying capacity/hour: 2200
Manufacturer: Leitner

List of all current ski lifts

Malga Piovernetta-Monte Pioverna (YOC 2010)

4pers. High speed chairlift (detachable)
Length: 991 m · Carrying capacity/hour: 2000
Manufacturer: Leitner

Val delle Lanze-Costa d'Agra (YOC 2010)

4pers. High speed chairlift (detachable)
Length: 1760 m · Carrying capacity/hour: 2200
Manufacturer: Leitner

Malga Piovernetta-Termental (YOC 2010)

4pers. High speed chairlift (detachable)
Length: 823 m · Carrying capacity/hour: 1800
Manufacturer: Leitner

Fondo Piccolo-Plaut (YOC 2009)

4pers. High speed chairlift (detachable)
Length: 1102 m · Carrying capacity/hour: 2000
Manufacturer: Leitner

Costa Moreta (YOC 2005)

4pers. High speed chairlift (detachable)
Length: 1179 m · Carrying capacity/hour: 2200
Manufacturer: Leitner

Serrada-Martinella (YOC 1998)

4pers. High speed chairlift (detachable)
Length: 1412 m · Carrying capacity/hour: 2200
Manufacturer: Leitner

Coston-Monte Coston (YOC 2006)

4pers. Chairlift (fixed-grip)
Length: 1680 m · Carrying capacity/hour: 1800
Manufacturer: Leitner

Fondo Piccolo-Cima Spill (YOC 2001)

4pers. Chairlift (fixed-grip)
Length: 565 m · Carrying capacity/hour: 2200
Manufacturer: Leitner

Ortesino-Sommo Alto (YOC 2000)

4pers. Chairlift (fixed-grip)
Length: 933 m · Carrying capacity/hour: 2200
Manufacturer: Leitner

Fondo Grande-Sommo Alto (YOC 1999)

4pers. Chairlift (fixed-grip)
Length: 970 m · Carrying capacity/hour: 2200
Manufacturer: Leitner

Fondo Piccolo-Cengio Rosso (YOC 1998)

4pers. Chairlift (fixed-grip)
Length: 505 m · Carrying capacity/hour: 2200
Manufacturer: Leitner

Fondo Grande-Martinella (YOC 1998)

4pers. Chairlift (fixed-grip)
Length: 907 m · Carrying capacity/hour: 2200
Manufacturer: Leitner

Fondo Piccolo-Truagalait (YOC 1993)

3pers. Chairlift (fixed-grip)
Length: 471 m · Carrying capacity/hour: 1800
Manufacturer: Leitner

Fondo Piccolo-Cargaore (YOC 1985)

3pers. Chairlift (fixed-grip)
Length: 663 m · Carrying capacity/hour: 1800
Manufacturer: Leitner

Tre Sassi-Monte Coston (YOC 2007)

2pers. Chairlift (fixed-grip)
Length: 392 m · Carrying capacity/hour: 1200
Manufacturer: Leitner

Dosso della Madonna (YOC 1989)

2pers. Chairlift (fixed-grip)
Length: 201 m · Carrying capacity/hour: 900
Manufacturer: Leitner

Francolini-Sommo Alto (YOC 1976)

2pers. Chairlift (fixed-grip)
Length: 1295 m · Carrying capacity/hour: 1400
Manufacturer: Leitner

Baby Fondo Grande (YOC 2001)

J-bar
Length: 270 m · Carrying capacity/hour: 720
Manufacturer: Leitner

Coston (YOC 2000)

J-bar
Length: 663 m · Carrying capacity/hour: 720
Manufacturer: MEB Impianti
Replacement lift: J-bar

Fiorentini (YOC 2000)

J-bar
Length: 553 m · Carrying capacity/hour: 720
Manufacturer: MEB Impianti

Plaut (YOC 1985)

J-bar
Length: 577 m · Carrying capacity/hour: 720
Manufacturer: Graffer

Baby Doppio Fondo Piccolo (YOC 1975)

J-bar
Length: 240 m · Carrying capacity/hour: 720
Manufacturer: Leitner

Feedback for the Skiresort.info Team? Please use this form »
Tips for the ski holiday