Ski resorts Savoie Mont Blanc
Change lift info:
Savoie Mont Blanc: new lifts 2024/2025
All new lifts in Savoie Mont Blanc for the 2024/2025 season
Overview: new ski lifts in Savoie Mont Blanc 2024/2025
New lifts at ski resorts in Savoie Mont Blanc : renewal of ski lifts or ski resort expansions in Savoie Mont Blanc
Total: 21
1 8 8 3 1
Add lifts and cable cars? Please report here
Savoie Mont Blanc: new ski lifts 2024/2025
- Savoie Mont Blanc – limit to
Tourism regions: Maurienne (10), Tarentaise (7), Pays du Mont Blanc (4), Beaufortain (2), Val d'Arly (2), Chablais (1), Portes du Soleil (1), Bornes Aravis (1)
Departments: Savoie (16), Haute-Savoie (7)
Districts: Saint-Jean-de-Maurienne (10), Albertville (9), Bonneville (5), Annecy (1)
Savoie Mont Blanc – switch toMountain ranges: Graian Alps (14), Dauphiné Alps (11), Savoy Prealps (6), Cottian Alps (5)
Parks: Vanoise (9)
1-13 out of 13 ski resorts
10pers. Gondola lift (monocable circulating ropeway)
Length: 2741 m
Carrying capacity/hour: 3000
160pers. Aerial tramway/Reversible ropeway
Length: 1713 m
Carrying capacity/hour: 1900
10pers. Gondola lift (monocable circulating ropeway)
Length: 1100 m
Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
10pers. Gondola lift (monocable circulating ropeway)
Length: 944 m
Carrying capacity/hour: 3000
Manufacturer: Poma
10pers. Gondola lift (monocable circulating ropeway)
Length: 722 m
Carrying capacity/hour: 1800
10pers. Gondola lift (monocable circulating ropeway)
Length: 1792 m
Carrying capacity/hour: 1600
Manufacturer: Poma
10pers. Gondola lift (monocable circulating ropeway)
Length: 2350 m
Carrying capacity/hour: 3000
Manufacturer: Poma
10pers. Gondola lift (monocable circulating ropeway)
Length: 3480 m
Carrying capacity/hour: 3700
6pers. High speed chairlift (detachable)
Length: 920 m
Carrying capacity/hour: 2400
Manufacturer: Poma
4pers. Chairlift (fixed-grip)
Length: 581 m
Carrying capacity/hour: 1800
Manufacturer: Poma
10pers. Gondola lift (monocable circulating ropeway)
Length: 2500 m
Carrying capacity/hour: 2400
4pers. Chairlift (fixed-grip)
Length: 1340 m
Carrying capacity/hour: 2400
6pers. High speed chairlift (detachable)
Length: 563 m
Carrying capacity/hour: 2400
4pers. Chairlift (fixed-grip)
Length: 830 m
Carrying capacity/hour: 2400
Manufacturer: Poma
4pers. Chairlift (fixed-grip)
Length: 1327 m
Carrying capacity/hour: 1800
Manufacturer: CCM Finotello
6pers. High speed chairlift (detachable)
Length: 1223 m
Carrying capacity/hour: 2800
1-13 out of 13 ski resorts