Worldwide
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Worldwide » Europe » Italy
Change region
Worldwide » Europe » Italy

New lifts and cable cars Italy (12)
Season 2014/2015

Borest (YOC 2014)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1300 m · Carrying capacity/hour: 3000
Manufacturer: Leitner
Replacement lift: 4pers. High speed chairlift (detachable)

Pralongiá (YOC 2014)

6pers. High speed chairlift (detachable)
Length: 1205 m · Carrying capacity/hour: 1800
Manufacturer: Leitner
Replacement lift: 3pers. Chairlift (fixed-grip)

Tschein (YOC 2014)

6pers. High speed chairlift (detachable)
Length: 1885 m · Carrying capacity/hour: 1600
Manufacturer: Leitner
Replacement lift: 3pers. Chairlift (fixed-grip)

Mont Blanc 1 (La Palud-Pavillon) (YOC 2014)

100pers. Aerial tramway/Reversible ropeway
Length: 1900 m · Carrying capacity/hour: 900
Manufacturer: Doppelmayr
Replacement lift: 31pers. Aerial tramway/Reversible ropeway

Plan Du Repos (YOC 2014)

6pers. High speed chairlift (detachable)
Length: 1800 m · Carrying capacity/hour: 2400
Ski resort: Espace San Bernardo/La Thuile-La Rosière (La Rosière)
Replacement lift: J-bar , J-bar

Vigo (YOC 2014)

6pers. High speed chairlift (detachable) with bubble
Length: 870 m · Carrying capacity/hour: 2400
Ski resort: Madonna di Campiglio-Pinzolo-Folgàrida-Marilléva (Folgàrida-Marilléva)
Replacement lift: 3pers. Chairlift (fixed-grip)

Molveno-Pradel (La Panoramica) (YOC 2014)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1006 m · Carrying capacity/hour: 1800
Manufacturer: Leitner
Replacement lift: 2pers. Cage lift

Orscellera (YOC 2014)

4pers. Chairlift (fixed-grip) Carrying capacity/hour: 2400
Replacement lift: 1pers. Chairlift (fixed-grip)

Pizzo Dosso (YOC 2014)

6pers. High speed chairlift (detachable) with bubble
Length: 1200 m · Carrying capacity/hour: 2400
Manufacturer: Bartholet BMF
Replacement lift: J-bar

Stiergarten (YOC 2014)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1791 m · Carrying capacity/hour: 1800
Manufacturer: Leitner
Ski resort: Sexten/Helm-Rotwand-Kreuzbergpass (Helm)

Drei Zinnen (YOC 2014)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2033 m · Carrying capacity/hour: 1800
Manufacturer: Leitner
Ski resort: Sexten/Helm-Rotwand-Kreuzbergpass (Helm)

Rosim-Bahn (YOC 2014)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1500 m · Carrying capacity/hour: 2000
Replacement lift: J-bar
Test Reports
Highlights
Slope preparation
Families and children
Highlights
Families and children
Beginners
Ski Special • Tips for the ski holiday
Photos
Events
Soelden
2015-04-23 – 2015-04-26
Lifts and Cable Cars
Ratschings-Jaufen
Live Webcam
Current Info
http://www.skiresort.info/ski-resort/carezza-ski/ski-lifts/
New Tschein 6-person chairlift
Just in time for the 2014/2015 winter season, the new 6-person Tschein chairlift at the Carezza ski resort will open and connect the zone southeast of the Moseralm, Paolina and Latemar with the Laurin slopes in the northwest of the Dolomiti Super Ski Resort in the Eggental. more...
Test Reports
Highlights
Ski resort size
Mountain restaurants, ski huts, gastronomy
Current Info
http://www.skiresort.info/ski-resort/reschenschoeneben/test-result/snow-park/
Schoeneben - Reschenpass
Freestyle and fun for everyone! The snow park offers 700 meters of pure shredding fun with, daily perfection guaranteed by QParks. The fun slope awaits as well combining elements from the slope, snow park and ski cross - a unique experience. more...