Worldwide
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Worldwide » Asia » South Korea » Gangwon-do
Change region
Worldwide » Asia » South Korea » Gangwon-do

New lifts and cable cars Gangwon-do (6)
Season 2007/2008

Jazz (Lift 6) (YOC 2007)

6pers. High speed chairlift (detachable)
Length: 863 m · Carrying capacity/hour: 3085
Manufacturer: Poma
Replacement lift: 4pers. High speed chairlift (detachable)

Ballad 2 (YOC 2007)

4pers. High speed chairlift (detachable)
Length: 468 m · Carrying capacity/hour: 2400
Manufacturer: Poma
Replacement lift: 4pers. Chairlift (fixed-grip)

Sweet Shuttle Gondola (YOC 2007)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2155 m · Carrying capacity/hour: 2400
Manufacturer: Poma

Tomato (YOC 2007)

6pers. High speed chairlift (detachable)
Length: 865 m · Carrying capacity/hour: 3085
Manufacturer: Poma

Cherry (YOC 2007)

6pers. High speed chairlift (detachable)
Length: 935 m · Carrying capacity/hour: 3085
Manufacturer: Poma

Apple (YOC 2007)

4pers. High speed chairlift (detachable)
Length: 675 m · Carrying capacity/hour: 2400
Manufacturer: Poma
Test Reports
Highlights
Lifts and cable cars
Families and children
Highlights
Slope preparation
Slope offering, run variety
Ski Special • Tips for the ski holiday
Events
Kitzbuehel
2015-01-23 – 2015-01-25
Soelden
2015-04-23 – 2015-04-26
Lifts and Cable Cars
Kitzbuehel
Live Webcam
Austria | Ski resort Hochzillertal
As of December 2013, there will be a new 6-person chairlift and a new 8-person chairlift at Hochzillertal. Both lifts will be equipped with weather protectors and seat heaters. more...
Test Reports
Highlights
Slope preparation
Environmentally friendly ski operation
The new 10-seater gondola lift Grubig II starts at the mid station and goes up to the Grubigstein. A perfect new lift to reach all the slopes very easy. more...