Select region
close
Continent
Country (optional)
Region (optional)
Change lift info:

Russia Combined lifts Russia

All combined lifts at ski resorts in Russia (CGD in Russia)


Description combined lift (Telemix)

This innovative ropeway system combines the advantages of a detachable gondola lift with those of a detachable chairlift. Gondolas and chairs are used simultaneously., whereby the boarding and exiting areas are separate and the requirements of the individual lift types are met.


Combined lifts/Telemix in Russia

10 in operation Details

Add lifts and cable cars? Please report here



Russia - expand to (number of combined lifts):

Map: combined lifts in Russia

Russia - limit to (number of combined lifts):

Russia Russia: combined lifts (chair/gondola) (10)

1-5 out of 5 ski resorts

Alpika Aibga-4 (YOC 2015)

Combined installation (4 pers. chair and 8 pers. gondola)
Length: 1079 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Alpika Aibga-6 (YOC 2015)

Combined installation (4 pers. chair and 8 pers. gondola)
Length: 1444 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Alpika Aibga-3 (YOC 2015)

Combined installation (4 pers. chair and 8 pers. gondola)
Length: 968 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Alpika Aibga-2 (YOC 2015)

Combined installation (4 pers. chair and 8 pers. gondola)
Length: 1068 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Alpika Aibga-5 (YOC 2015)

Combined installation (4 pers. chair and 8 pers. gondola)
Length: 613 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Alpika Aibga-1 (YOC 2013)

Combined installation (4 pers. chair and 8 pers. gondola)
Length: 1309 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

Gorny Vozdukh 2 (YOC 2007)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 965 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
All lifts

K6 Big Wood (YOC 2014)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1616 m · Carrying capacity/hour: 2400
Manufacturer: Bartholet BMF
Replacement lift: T-bar
All lifts

Sheregesh (YOC 2007)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1700 m · Carrying capacity/hour: 2500
Manufacturer: Doppelmayr
All lifts

Khaty-Mansijsk 1 (YOC 2008)

Combined installation (4 pers. chair and 8 pers. gondola)
Length: 1003 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Ski resort
    1-5 out of 5 ski resorts