Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Change lift info:

Veneto: planned lifts

All planned lifts in Veneto - Lift projects at ski resorts in Veneto (renewal, development and integration)


Overview: planned ski lifts in Veneto

Total: 5
1
4

Add lifts and cable cars? Please report here


See also:
New lifts 2014/2015



Veneto - expand to (number of planned ski lifts):

Map: planned ski lifts in Veneto

Veneto - limit to (number of planned ski lifts):

Veneto: planned ski lifts

1-3 out of 3 ski resorts

planned: Folgaria-Francollini-Sommo Alto

8pers. Gondola lift (monocable circulating ropeway)
Length: 2500 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

planned: Fondo Piccolo-Sommo Alto

4pers. High speed chairlift (detachable)
Length: 1200 m · Carrying capacity/hour: 2200
Manufacturer: Leitner
All lifts

planned: Arabba Fly (Bj. 2015)

4pers. Chairlift (fixed-grip)
Length: 339 m · Carrying capacity/hour: 2000
All lifts

planned: Valgrande-Col d’la Tenda (Bj. 2016)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400

planned: Valgrande-Popera (Bj. 2016)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
All lifts
    1-3 out of 3 ski resorts