Select region
close
Continent
Country (optional)
Region (optional)
Change lift info:

Switzerland Switzerland: new lifts 2015/2016

All new lifts in Switzerland for the 2015/2016 - season - new lifts at ski resorts in Switzerland : renewal of ski lifts or ski resort expansions in Switzerland


Overview: new ski lifts in Switzerland 2015/2016

Total: 21
1
7
3
9
1

Add lifts and cable cars? Please report here



Switzerland - expand to (number of new lifts):

Map: new lift in Switzerland

Switzerland - limit to (number of new lifts):

Switzerland Switzerland: new ski lifts 2015/2016

1-15 out of 15 ski resorts

Rothornbahn 2 (YOC 2015)

58pers. Aerial tramway/Reversible ropeway
Length: 2073 m · Carrying capacity/hour: 560
Manufacturer: Garaventa
Ski resort: Arosa-Lenzerheide (Lenzerheide)
Replacement lift: 60pers. Aerial tramway/Reversible ropeway

Portal Churwalden (Churwalden-Heidbüel) (YOC 2015)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1778 m · Carrying capacity/hour: 2200
Manufacturer: Bartholet BMF
Ski resort: Arosa-Lenzerheide (Lenzerheide)
Replacement lift: 3pers. Chairlift (fixed-grip)

Obertor (Ost-West Verbindung) (YOC 2015)

4pers. Chairlift (fixed-grip)
Length: 582 m · Carrying capacity/hour: 1200
Manufacturer: Bartholet BMF
Ski resort: Arosa-Lenzerheide (Lenzerheide)
All lifts

Bergläger-Höchsthorn (YOC 2015)

4pers. High speed chairlift (detachable)
Length: 1500 m · Carrying capacity/hour: 2000
Manufacturer: Garaventa
All lifts

planned: Esserts–Planards–Savoleyres (YOC 2015)

Combined installation (6 pers. chair and 10 pers. gondola) with seat heating
Length: 2100 m · Carrying capacity/hour: 2100
Ski resort: Les Quatre Vallées (Verbier)
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)
T-bar
All lifts

Prui-Clünas (YOC 2015)

6pers. High speed chairlift (detachable) with bubble
Length: 1742 m · Carrying capacity/hour: 2400
Replacement lift: T-bar
T-bar
All lifts

Riederalp-Blausee-Moosfluh (YOC 2015)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1754 m · Carrying capacity/hour: 2400
Manufacturer: Garaventa
Ski resort: Aletsch Arena (Riederalp)
Replacement lift: 12pers. Gondola lift (monocable circulating ropeway)
All lifts

Engelberg-Trübsee (YOC 2015)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2685 m · Carrying capacity/hour: 2400
Manufacturer: Garaventa
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)

Trübsee-Stand (YOC 2015)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1996 m · Carrying capacity/hour: 2400
Manufacturer: Garaventa
All lifts

Alp Sogn Martin-La Siala (YOC 2015)

10pers. Gondola lift (monocable circulating ropeway)
Length: 3366 m · Carrying capacity/hour: 2400
Manufacturer: Leitner
Replacement lift: 3pers. High speed chairlift (detachable)
All lifts

Stafel-Hörnli (Hirli) (YOC 2015)

6pers. High speed chairlift (detachable) with bubble
Length: 1980 m · Carrying capacity/hour: 2000
Ski resort: Zermatt
Replacement lift: T-bar
All lifts

Mandra (YOC 2015)

4pers. Chairlift (fixed-grip)
Length: 670 m · Carrying capacity/hour: 2000
Manufacturer: Bartholet BMF
Replacement lift: T-bar
All lifts

Espel-Stöfeli-Chäserrugg (YOC 2015)

10pers. Gondola lift (monocable circulating ropeway)
Length: 2494 m · Carrying capacity/hour: 2400
Manufacturer: Garaventa
Replacement lift: T-bar
T-bar
All lifts

planned: Oberalppass-Piz Calmut (YOC 2015)

6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 970 m · Carrying capacity/hour: 2400
Manufacturer: Bartholet BMF
Replacement lift: T-bar
All lifts

Gurschen-Gurschenalp (YOC 2015)

6pers. High speed chairlift (detachable) with bubble
Length: 1000 m · Carrying capacity/hour: 2400
Replacement lift: 2pers. Chairlift (fixed-grip)
T-bar
All lifts

planned: La Forêt-Le Rotzé (YOC 2015)

6pers. High speed chairlift (detachable)
Length: 1523 m · Carrying capacity/hour: 1600
Replacement lift: J-bar
All lifts

planned: Andermatt–Nätschen (YOC 2015)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1300 m · Carrying capacity/hour: 2400
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Nätschen–Gütsch (YOC 2015)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1500 m · Carrying capacity/hour: 2400
Replacement lift: 4pers. High speed chairlift (detachable)

planned: Unterstafel–Gütsch (YOC 2015)

4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000
Replacement lift: T-bar

planned: Trainerlift Nätschen (YOC 2015)

T-bar
Carrying capacity/hour: 1000
All lifts

planned: Tschierv-Alp da Munt (YOC 2015)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1400 m · Carrying capacity/hour: 1200
All lifts
    1-15 out of 15 ski resorts