Change lift info:

Romandy (Romandie): planned lifts

All planned lifts in Western Switzerland (Welschland) - Lift projects at ski resorts in Western Switzerland (Welschland) (renewal, development and integration)


Overview: planned ski lifts in Western Switzerland (Welschland)

Total: 6
3
1
2

Add lifts and cable cars? Please report here


See also:
New lifts 2017/2018



Map: planned ski lifts in Western Switzerland (Welschland)

Show map
Romandy (Romandie) – switch to

Romandy (Romandie): planned ski lifts

1-5 out of 5 ski resorts

planned: Esserts–Planards–Savoleyres (YOC 2018)

Combined installation (6 pers. chair and 10 pers. gondola) with seat heating
Length: 2100 m · Carrying capacity/hour: 2100
Ski resort: 4 Vallées – Verbier/​La Tzoumaz/​Nendaz/​Veysonnaz/​Thyon [Verbier]
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)
T-bar
All lifts

planned: Morgins-La Foilleuse

6pers. High speed chairlift (detachable)
Length: 1404 m · Carrying capacity/hour: 2400
Ski resort: Les Portes du Soleil – Morzine/​Avoriaz/​Les Gets/​Châtel/​Morgins/​Champéry [Morgins]
Replacement lift: 3pers. High speed chairlift (detachable)
All lifts

planned: Aminona-Colombire-Grangettes (YOC 2018)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2000 m · Carrying capacity/hour: 2000
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)

planned: Plaine-Morte

4pers. Chairlift (fixed-grip)

All lifts

planned: Diablerets-Isenau (YOC 2018)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2400 m · Carrying capacity/hour: 1200
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)
All lifts

planned: Panoramabahn Gstaad-Eggli (YOC 2017)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1326 m · Carrying capacity/hour: 1200
Manufacturer: Bartholet BMF
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)
All lifts
1-5 out of 5 ski resorts