Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Change lift info:

Veneto: new lifts 2010/2011

All new lifts in Veneto for the 2010/2011 - season - new lifts at ski resorts in Veneto : renewal of ski lifts or ski resort expansions in Veneto


Overview: new ski lifts in Veneto 2010/2011

Total: 9
5
4

Add lifts and cable cars? Please report here



Veneto - expand to (number of new lifts):

Map: new lift in Veneto

Veneto - limit to (number of new lifts):

Veneto: new ski lifts 2010/2011

1-5 out of 5 ski resorts

Malga Piovernetta-Monte Pioverna (Bj. 2010)

4pers. High speed chairlift (detachable)
Length: 991 m · Carrying capacity/hour: 2000
Manufacturer: Leitner

Malga Piovernetta-Termental (Bj. 2010)

4pers. High speed chairlift (detachable)
Length: 823 m · Carrying capacity/hour: 1800
Manufacturer: Leitner

Val delle Lanze-Costa d'Agra (Bj. 2010)

4pers. High speed chairlift (detachable)
Length: 1760 m · Carrying capacity/hour: 2200
Manufacturer: Leitner
All lifts

Socrepes Ra Fréza (Bj. 2010)

4pers. Chairlift (fixed-grip)
Length: 413 m · Carrying capacity/hour: 1790
Manufacturer: Doppelmayr
Cortina d'Ampezzo (Tofana)
Replacement lift: J-bar
All lifts

Palafavera (Bj. 2010)

J-bar
Length: 669 m · Carrying capacity/hour: 720
Manufacturer: Leitner
Civetta (Zoldo Alto/Val di Zoldo)
Replacement lift: J-bar
All lifts

Pian Casale-Col d’la Tenda (Bj. 2010)

4pers. High speed chairlift (detachable) with bubble
Length: 2126 m · Carrying capacity/hour: 1400
Manufacturer: Doppelmayr

Cenerentola (Bj. 2010)

J-bar
Length: 370 m · Carrying capacity/hour: 870
Manufacturer: Leitner
Replacement lift: J-bar
All lifts

Campon 3 (Bj. 2010)

J-bar
Carrying capacity/hour: 720
Manufacturer: Graffer
Ski resort
    1-5 out of 5 ski resorts