Austria
Select region
close
Countries
States
Greater Regions
Districts
Tourism regions

New at KitzSki – Kitzbühel/​Kirchberg

2023/2024


Trattenbach


6pers. High speed chairlift (detachable) with bubble and seat heating

Details here


Gauxjoch


6pers. High speed chairlift (detachable) with bubble and seat heating

Details here


Streiteckmulde


People mover/Moving Carpet

Details here


Sun Cord Reith


People mover/Moving Carpet

Details here


2019/2020


Fleckalmbahn


10pers. Gondola lift with seat heating (monocable circulating ropeway)

Details here


2018/2019


Raintal


10pers. Gondola lift with seat heating (monocable circulating ropeway)

Details here


Brunelle


6pers. High speed chairlift (detachable) with bubble and seat heating

Details here


2017/2018


Jufen


8pers. High speed chairlift (detachable) with bubble and seat heating

Details here


Investment drive throughout the entire ski resort

The quality campaign will continue next winter Since the year 2000, the Bergbahn AG Kitzbühel lift operator has invested 269 million euros into a comprehensive infrastructure programme. One again this year, several million euros will be invested in quality improvements on the mountain. The key focus of this investment programme for the winter of 2017/2018 was the introduction of the new Jufen 8-person chairlift in a brand-new Pininfarina design, taking lift construction into a new dimension of quality and comfort.

2016/2017


Optimisation of slope quality

• Improvements on the Resterkogel - Hangl blue connecting slope
• Adaptation of the Hangl - Resterkogel valley blue connecting slope
• Improvement on the end section of red slope 70a to the Resterhöhe mountain station
• Adjustment on red slope 72 near the Funpark
• Widening of the Hangl - Hartkaser connecting slope
• Improvement/adaptation of terrain on slope 68 Gaux
• Widening of the Bärenbadkogel I mountain - Bärenbadkogel II valley connecting slope before the bridge
• Adaptation of Bärenbadkogel Nord (north), slope 65, in the area after the chapel
• Improvement on slope 19 Walde - Ehrenbachgraben at Sonnbühel
• Improvement on the Parallelstreif in the Seidlalm area (doubling of slope width)
• Widening of the Hausbergkante - Ganslern connecting slope before the start of the ski bridge
• Widening of the Familien-Streif (family Streif) in the compression area - Rasmusleiten entrance by removing trees and adapting the terrain
• Widening of the Maierl mountain station - Ochsalm connecting slope with optimisation of the junction area
• Improvement at the start of red slope 27a Brunn in the Pengelstein II mountain station area
• Improvement on slope 27a Brunn on the final section to the base station

Kitzbüheler Horn snow production

New reservoir with total capacity of 111,000 cubic metres, 12.8 km of water pipe construction and 55 new snow-production machines (30 lances and 25 propellers)

For even greater skiing comfort in winter 2016/2017

• Increased snow-making capability as a result of expansion and optimisation of artificial snow-making facilities in the core ski resort. • Supporting snow production on the Kitzbüheler Horn up to the middle station on existing ski runs (+ Hornköpfl reservoir + 9 km of snow-production pipes + 55 state-of-the-art snow-production machines) Did you know that the KitzSki snow depots conserve (old) snow and energy for the following winter and that KitzSki started ski operations on the Resterkogel as early as 22 October in 2016 and on 5 November 2016 on the Walde?

2015/2016


Bichlalmbahn


2pers. Chairlift (fixed-grip)

Details here


Brunn


8pers. High speed chairlift (detachable) with bubble and seat heating

Details here


NEW in winter 2015/16

• Since the year 2000, the Bergbahn Kitzbühel lift operator has invested over 225 million euros in a quality campaign aimed at improving visitor comfort. • Brunn 8-person chairlift with heated seats and weather-protection covers
• 3 slopes (for all levels of ability - blue / red / black)
• Including artificial snow production and reservoir
• Total investment of 20.5 million euros for even greater skiing comfort

2014/2015


Märchenwald


People mover/Moving Carpet

Details here


News 2014/15

Since the year 2000, the Bergbahn Kitzbühel lift operator has invested over 210 million euros in a quality campaign aimed at improving visitor comfort. Widening of the slope (Diretissima run number 38) in the Schlagl area has been completed and extensive preparations are underway for the construction of a reservoir for future use in Brunn snow production facilities. The Märchenwald telecord lift on the Hahnenkamm has also been replaced by a moving carpet.

2013/2014


Wagstättbahn


10pers. Gondola lift with seat heating (monocable circulating ropeway)

Details here


Starthaus


People mover/Moving Carpet

Details here


Free KitzSki wifi

Free internet access is available at around 46 wifi stations throughout the entire ski resort of Kitzbühel.

Comfort improvements in the ski resort

-New moving carpet at the Hahnenkamm starting gate for better access to the slopes
-New Resterkogel slope variation with direct connection to the Resterhöhe valley run
-New design for the Fleck entrance near the Ehrenbachhöhe reservoir

2012/2013


Zweitausender


8pers. High speed chairlift (detachable) with bubble and seat heating

Details here


Walde


6pers. High speed chairlift (detachable) with bubble and seat heating

Details here


Additional slope improvements

Significant improvements have been made to the slopes on the Familienstreif and the Kaser and there are now 794 snow-production machines in operation.


2011/2012


Resterhöhe


6pers. High speed chairlift (detachable) with bubble and seat heating

Details here


2010/2011


Maierl


10pers. Gondola lift with seat heating (monocable circulating ropeway)

Details here


Ochsalmbahn


8pers. High speed chairlift (detachable) with bubble and seat heating

Details here


Visitor infotainment for even greater safety

Throughout the resort, around 100 LCD monitors provide relevant real-time information on safety, current statuses of lifts and slopes, as well as useful tips for the ski area.

New reservoir for even greater snow-reliability on the Streif

Seidlalm II reservoir with additional snow-making facility as well as the existing Seidlalm reservoir: Another reservoir with a capacity of approximately 150,000 m3 (compared with around 33,000 m3 for the current one) is being created on the tree-covered hilltop to the north of the existing reservoir. This will reduce the time required to produce snow on the Streif, Ganslernhang and Kampen by around a third.

2009/2010


Kasereck


8pers. High speed chairlift (detachable) with bubble and seat heating

Details here


Ministreif


People mover/Moving Carpet

Details here


Completion of the Alter Kaser

easy ski slope for Maierl III

New Gaisberg reservoir

for snow-making on the toboggan run

2008/2009


Ganslern


4pers. High speed chairlift (detachable)

Details here


2007/2008


Steinbergkogel


8pers. High speed chairlift (detachable) with bubble and seat heating

Details here


2006/2007


Ehrenbachhöhe


6pers. High speed chairlift (detachable) with bubble

Details here


Hanglalm


6pers. High speed chairlift (detachable)

Details here


2005/2006


Panoramabahn Kitzbüheler Alpen I


8pers. Gondola lift (monocable circulating ropeway)

Details here


Panoramabahn Kitzbüheler Alpen II


8pers. Gondola lift (monocable circulating ropeway)

Details here


Sonnenrast


6pers. High speed chairlift (detachable)

Details here


2004/2005


3-S-Bahn


30pers. Tricable ropeway

Details here


Bärenbadkogel 1


6pers. High speed chairlift (detachable)

Details here


Sun Kid Resterhöhe


People mover/Moving Carpet with cover

Details here


2003/2004


Gaisberg


4pers. High speed chairlift (detachable)

Details here


Pengelstein I


8pers. Gondola lift (monocable circulating ropeway)

Details here


2002/2003


Bärenbadkogel 2


6pers. High speed chairlift (detachable)

Details here


Hartkaser


8pers. High speed chairlift (detachable)

Details here


Resterkogel


4pers. Chairlift (fixed-grip)

Details here


Expansion of snow-making capabilities


2001/2002


2000/2001


Pengelstein II


4pers. High speed chairlift (detachable) with bubble

Details here


Mocking


People mover/Moving Carpet

Details here


Sun Kid Aschau


People mover/Moving Carpet

Details here


1999/2000


Talsen


4pers. High speed chairlift (detachable)

Details here


Sun Kid Horn


People mover/Moving Carpet

Details here


1996/1997


Hahnenkammbahn


6pers. Gondola lift with seat heating (monocable circulating ropeway)

Details here


1994/1995


Silberstube


4pers. Chairlift (fixed-grip)

Details here


1993/1994


1991/1992


Alpenhaus


2pers. Chairlift (fixed-grip)

Details here


Hornbahn I


6pers. Gondola lift (monocable circulating ropeway)

Details here


Hornbahn II


6pers. Gondola lift (monocable circulating ropeway)

Details here


Hornköpfl


2pers. Chairlift (fixed-grip)

Details here


1989/1990


Hochsaukaser


4pers. Chairlift (fixed-grip)

Details here


1987/1988


Hieslegg


4pers. High speed chairlift (detachable)

Details here


1984/1985


Trattalmmulde


People mover/Moving Carpet

Details here


1971/1972


1955/1956


Horngipfelbahn


40pers. Aerial tramway/Reversible ropeway

Details here


Feedback for the Skiresort.info Team? Please use this form »