Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)

All lifts/cable cars Vall de Núria

Directly to:

Number of ski lifts

  • 5

Total capacity

4840 Passengers/hour

Total lift length

14.6 km Total

1 Cog railway
1 Cog railway
1 Circulating ropeway/gondola lift
1 6pers. Pulsed-movement aerial ropeway (gondola)
1 Chairlift
1 4pers. Chairlift (fixed-grip)
2 T-bar lift/platter/button lift
2 J-bar

Other types of ascension mechanisms

1 People mover

List of all current ski lifts

Cremallera Ribes de Freser-Vall de Núria (YOC 1932)

Cog railway
Length: 12500 m · Carrying capacity/hour: 1200

Coma del Clot (YOC 1987)

6pers. Pulsed-movement aerial ropeway (gondola)
Length: 657 m · Carrying capacity/hour: 400
Manufacturer: Agudio

De la Pala Chair Lift (YOC 1990)

4pers. Chairlift (fixed-grip)
Length: 727 m · Carrying capacity/hour: 1800
Manufacturer: Poma

Cabana Pastors (YOC 1995)

J-bar
Length: 293 m · Carrying capacity/hour: 720
Manufacturer: Reac

Finestrelles (YOC 1995)

J-bar
Length: 394 m · Carrying capacity/hour: 720
Manufacturer: Reac

Feedback for the Skiresort.info Team? Please use this form »
Test Reports

Access, on-site parking
Advanced skiers, freeriders


Lifts and cable cars
Families and children

All test reports
Tips for the ski holiday