All lifts/cable cars Stubai Glacier (Stubaier Gletscher)
As of the 2016/2017 season, the new, ultra-modern 3-S Eisgrat lift brings guests up to the Stubai Glacier. It is the longest 3-S lift in the Alps and leads from the Mutterbergalm to the Fernau middle station and up to the Eisgrat at 2900 m. The smooth ride, comfortable design and free WLAN during the short transport time of only 10.7 minutes make the lift one of the highlights of the ski resort. A completely new base station with a large ski depot was also built beneath the Mutterbergalm. Additionally, you can access the Gamsgarten from the valley via the Fernau middle station with the Gamsgarten 6-person gondola lift.
Up on the Stubai Glacier, there is a good mixture of gondola lifts, chairlifts and tow lifts. The most-used chairlifts are detachable (high speed) and have weather protectors.
Number of ski lifts |
|
Total capacity | 43784 Passengers/hour |
Total lift length | 25.4 km Total |
New ski lifts
Zoo-Shuttle/Snowpark-Lift (YOC 2021)
Rope tow/baby lift with low rope towLength: 310 m · Carrying capacity/hour: 387
Manufacturer: Sunkid
Details
List of all current ski lifts
Eisgratbahn II (YOC 2016)
32pers. Tricable ropewayLength: 2249 m · Carrying capacity/hour: 3014
Manufacturer: LEITNER
Details
Eisgratbahn I (YOC 2016)
32pers. Tricable ropewayLength: 2437 m · Carrying capacity/hour: 3014
Manufacturer: LEITNER
Details
Schaufeljochbahn (YOC 2003)
8pers. Gondola lift (monocable circulating ropeway)Length: 1177 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Gamsgarten I (YOC 1992)
6pers. Gondola lift (monocable circulating ropeway)Length: 1910 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Gamsgarten II (YOC 1992)
6pers. Gondola lift (monocable circulating ropeway)Length: 1570 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Rotadlbahn (YOC 2012)
8pers. High speed chairlift (detachable) with bubble and seat heatingLength: 1355 m · Carrying capacity/hour: 3400
Manufacturer: Doppelmayr
Details
Fernau (YOC 2000)
6pers. High speed chairlift (detachable) with bubbleLength: 2067 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Details
Eisjoch (YOC 1998)
6pers. High speed chairlift (detachable) with bubbleLength: 2268 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Details
Murmelebahn (YOC 2001)
6pers. Chairlift (fixed-grip)Length: 500 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Details
Daunjoch (YOC 2012)
4pers. High speed chairlift (detachable)Length: 1197 m · Carrying capacity/hour: 1600
Manufacturer: Doppelmayr
Details
Wildspitz (YOC 2007)
2pers. Chairlift (fixed-grip)Length: 383 m · Carrying capacity/hour: 1400
Manufacturer: LEITNER
Details
Pfaffengrat (YOC 1999)
2pers. Chairlift (fixed-grip)Length: 323 m · Carrying capacity/hour: 1200
Manufacturer: LEITNER
Details
Daunscharte (YOC 2008)
T-barLength: 822 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Details
Daunferner II (YOC 2001)
T-barLength: 1146 m · Carrying capacity/hour: 1428
Manufacturer: Doppelmayr
Details
Windachferner (YOC 1997)
T-barLength: 378 m · Carrying capacity/hour: 1160
Manufacturer: Doppelmayr
Details
Daunferner I (YOC 1986)
T-barLength: 1620 m · Carrying capacity/hour: 1440
Manufacturer: Doppelmayr
Details
Gaisskarferner (YOC 1978)
T-barLength: 1121 m · Carrying capacity/hour: 1250
Manufacturer: Doppelmayr
Details
Fernau (YOC 1971)
T-barLength: 903 m · Carrying capacity/hour: 1191
Manufacturer: Doppelmayr
Details
Zoo-Shuttle/Snowpark-Lift (YOC 2021)
Rope tow/baby lift with low rope towLength: 310 m · Carrying capacity/hour: 387
Manufacturer: Sunkid
Details
Übungslift Gamsgarten (YOC 2014)
Rope tow/baby lift with low rope towLength: 209 m · Carrying capacity/hour: 650
Details
Förderband Gamsgarten 1 (YOC 2019)
People mover/Moving Carpet with coverLength: 66 m · Carrying capacity/hour: 1000
Manufacturer: Sunkid
Details
Förderband Gamsgarten 3 (YOC 2018)
People mover/Moving Carpet with coverLength: 39 m · Carrying capacity/hour: 1000
Manufacturer: Sunkid
Details
Förderband Gamsgarten 2 (YOC 2008)
People mover/Moving Carpet with coverLength: 51 m · Carrying capacity/hour: 1000
Manufacturer: Sunkid
Details
Förderband Gamsgarten 4 (YOC 2002)
People mover/Moving Carpet with coverLength: 24 m · Carrying capacity/hour: 1000
Manufacturer: Sunkid
Details