Switzerland
  • Schilthorn – Mürren/Lauterbrunnen
    • Worldwide
    • Europe
    • Switzerland
    • Espace Mittelland
    • Bern
    • Bernese Oberland
    • Jungfrau Region
Select region
close
Countries
Greater Regions
Cantons
Other
Tourism regions
Birg-Schilthorn (Piz Gloria) - 100pers. Aerial tramway/Reversible ropeway 1/18

All lifts/cable cars Schilthorn – Mürren/Lauterbrunnen

Four consecutive cable car lifts bring guests from the Stechelberg base station over Gimmelwald, Mürren and Birg up to the peak of the 2970 m high Schilthorn. When there are no crowds, the ascent takes about 30 minutes. The trip up to the Schilthorn is also very popular with non-skiers because of the spectacular panorama of the Eiger, Mönch and Jungfrau (Swiss Skyline).A cable car lift leads from the base station in Lauterbrunnen to Grütschalp. From there, a narrow gauge railway takes guests to the Winteregg chairlift up to the ski resort.There are primarily chairlifts in the ski resort. Some of these are high speed chairlifts with weather protectors. Tow lifts and a funicular complete the lift offering.

Number of ski lifts

  • 16

Total capacity

13852 Passengers/hour

Total lift length

16.6 km Total

1 65pers. Funicular
4 100pers. Aerial tramway/Reversible ropeway
1 75pers. Aerial tramway/Reversible ropeway
2 4pers. High speed chairlift (detachable) with bubble
1 4pers. High speed chairlift (detachable)
4 2pers. Chairlift (fixed-grip)
1 T-bar
1 J-bar
1 Rope tow/beginner lift

New ski lifts

Gimmeln-Schiltgrad (YOC 2014)

T-bar
Length: 1100 m · Carrying capacity/hour: 772
Manufacturer: Doppelmayr
Replacement lift: T-bar

Allmendhubel (YOC 2014)

J-bar
Length: 239 m · Carrying capacity/hour: 600
Manufacturer: Doppelmayr
Replacement lift: J-bar

List of all current ski lifts

Allmendhubel (YOC 1999)

65pers. Funicular
Length: 551 m · Carrying capacity/hour: 980
Manufacturer: Doppelmayr

Lauterbrunnen-Grütschalp (YOC 2006)

100pers. Aerial tramway/Reversible ropeway
Length: 1432 m · Carrying capacity/hour: 590
Manufacturer: Garaventa
Replacement lift: Funicular

Birg-Schilthorn (Piz Gloria) (YOC 1967)

100pers. Aerial tramway/Reversible ropeway
Length: 1766 m · Carrying capacity/hour: 600
Manufacturer: Von Roll
Replacement lift: Aerial tramway/Reversible ropeway

Stechelberg-Gimmelwald (YOC 1965)

100pers. Aerial tramway/Reversible ropeway
Length: 1188 m · Carrying capacity/hour: 600
Manufacturer: Von Roll

Gimmelwald-Mürren (YOC 1965)

100pers. Aerial tramway/Reversible ropeway
Length: 1198 m · Carrying capacity/hour: 600
Manufacturer: Von Roll

Mürren-Birg (YOC 2000)

75pers. Aerial tramway/Reversible ropeway
Length: 2780 m · Carrying capacity/hour: 600
Manufacturer: Von Roll
Replacement lift: Aerial tramway/Reversible ropeway

Winteregg (YOC 2009)

4pers. High speed chairlift (detachable) with bubble
Length: 1386 m · Carrying capacity/hour: 1600
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Riggli-Birg (YOC 2006)

4pers. High speed chairlift (detachable) with bubble
Length: 1001 m · Carrying capacity/hour: 1200
Manufacturer: Leitner
Replacement lift: T-bar

Schiltgrat (YOC 1998)

4pers. High speed chairlift (detachable)
Length: 1522 m · Carrying capacity/hour: 1200
Manufacturer: Leitner
Replacement lift: T-bar

Allmiboden-Allmendhubel (YOC 2009)

2pers. Chairlift (fixed-grip)
Length: 300 m · Carrying capacity/hour: 1010
Manufacturer: Garaventa

Maulerhubel (YOC 2001)

2pers. Chairlift (fixed-grip)
Length: 519 m · Carrying capacity/hour: 1000
Manufacturer: Leitner
Replacement lift: T-bar

Muttleren (YOC 1993)

2pers. Chairlift (fixed-grip)
Length: 563 m · Carrying capacity/hour: 1000
Manufacturer: Garaventa

Kandahar (YOC 1993)

2pers. Chairlift (fixed-grip)
Length: 1001 m · Carrying capacity/hour: 1000
Manufacturer: Garaventa

Gimmeln-Schiltgrad (YOC 2014)

T-bar
Length: 1100 m · Carrying capacity/hour: 772
Manufacturer: Doppelmayr
Replacement lift: T-bar

Allmendhubel (YOC 2014)

J-bar
Length: 239 m · Carrying capacity/hour: 600
Manufacturer: Doppelmayr
Replacement lift: J-bar

Übungslift Mürren

Rope tow/beginner lift
Length: 60 m · Carrying capacity/hour: 500

Feedback for the Skiresort.info Team? Please use this form »