Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)

All lifts/cable cars Piani di Bobbio

Directly to:

Number of ski lifts

  • 8

Total capacity

11769 Passengers/hour

Total lift length

6.4 km Total

1 Circulating ropeway/gondola lift
1 12pers. Gondola lift (monocable circulating ropeway)
4 Chairlift
1 4pers. High speed chairlift (detachable)
3 4pers. Chairlift (fixed-grip)
3 T-bar lift/platter/button lift
3 J-bar

Other types of ascension mechanisms

3 People mover

New ski lifts

Nuova Orscellera (YOC 2014)

4pers. Chairlift (fixed-grip)
Length: 535 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
Replacement lift: 1pers. Chairlift (fixed-grip)

List of all current ski lifts

Barzio-Bobbio (YOC 1993)

12pers. Gondola lift (monocable circulating ropeway)
Length: 2148 m · Carrying capacity/hour: 2160
Manufacturer: Agamatic

Ceresola-Bobbio (Chiavello) (YOC 2010)

4pers. High speed chairlift (detachable)
Length: 1273 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Nuova Orscellera (YOC 2014)

4pers. Chairlift (fixed-grip)
Length: 535 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
Replacement lift: 1pers. Chairlift (fixed-grip)

Camosci (YOC 2007)

4pers. Chairlift (fixed-grip)
Length: 1026 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr

Fortino (YOC 1998)

4pers. Chairlift (fixed-grip)
Length: 929 m · Carrying capacity/hour: 2112
Manufacturer: Doppelmayr

Chiesetta (YOC 2005)

J-bar
Length: 509 m · Carrying capacity/hour: 897
Manufacturer: Leitner

Ongania

J-bar
Carrying capacity/hour: 600

Capanno

J-bar
Carrying capacity/hour: 600

Feedback for the Skiresort.info Team? Please use this form »
Test Reports
Tips for the ski holiday