Italy
Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)

All lifts/cable cars Pejo

Number of ski lifts

  • 7

Total capacity

8396 Passengers/hour

Total lift length

8.6 km Total

1 100pers. Funifor - wind stable ropeway with wide rope gauge
1 6pers. Gondola lift (monocable circulating ropeway)
1 4pers. High speed chairlift (detachable)
1 4pers. Chairlift (fixed-grip)
1 3pers. Chairlift (fixed-grip)
1 2pers. Chairlift (fixed-grip)
1 J-bar

New ski lifts

Saroden-Cima Vioz (YOC 2016)

4pers. High speed chairlift (detachable)
Length: 1000 m · Carrying capacity/hour: 2000

List of all current ski lifts

Pejo 3000 (Tarlenta-Rifugio Mantova) (YOC 2010)

100pers. Funifor - wind stable ropeway with wide rope gauge
Length: 2856 m · Carrying capacity/hour: 860
Manufacturer: Doppelmayr

Pejo Fonti-Tarlenta (YOC 1994)

6pers. Gondola lift (monocable circulating ropeway)
Length: 1670 m · Carrying capacity/hour: 1400
Manufacturer: Agamatic

Saroden-Cima Vioz (YOC 2016)

4pers. High speed chairlift (detachable)
Length: 1000 m · Carrying capacity/hour: 2000

Doss dei Cembri (YOC 2008)

4pers. Chairlift (fixed-grip)
Length: 1191 m · Carrying capacity/hour: 896
Manufacturer: Doppelmayr
Replacement lift: 1pers. Chairlift (fixed-grip)

Busa Stavelin- Doss dei Cembri (YOC 2003)

3pers. Chairlift (fixed-grip)
Length: 325 m · Carrying capacity/hour: 1320
Manufacturer: Graffer

Mezoli (YOC 1990)

2pers. Chairlift (fixed-grip)
Length: 770 m · Carrying capacity/hour: 1200
Manufacturer: Leitner

Biancaneve

J-bar
Length: 800 m · Carrying capacity/hour: 720

Feedback for the Skiresort.info Team? Please use this form »
Tips for the ski holiday