Andorra
Select region
close
Continents
Countries
Telecabina de La Massana - 16pers. Gondola lift (bicable circulating ropeway) 1/23

All lifts/cable cars Pal/Arinsal – La Massana (Vallnord)

The gondola lifts go up from La Massana and Arinsal. There is no direct access to the slopes from these points. A chairlift goes up from Cota (1550 m) and there is also a valley run here. Almost all of the slopes in the ski resort are accessed by chairlifts, most of them with high speed detachable chairlifts. The Pal and Arinsal sections are connected by a cable car lift.

Number of ski lifts

  • 23
  • Heli-skiing

Total capacity

37400 Passengers/hour

Total lift length

20.8 km Total

1 50pers. Aerial tramway/Reversible ropeway
1 16pers. Gondola lift (bicable circulating ropeway)
1 6pers. Gondola lift (monocable circulating ropeway)
3 6pers. High speed chairlift (detachable)
2 4pers. High speed chairlift (detachable)
5 4pers. Chairlift (fixed-grip)
2 2pers. Chairlift (fixed-grip)
8 J-bar

Other types of ascension mechanisms

7 People mover
1 Helicopter for Heli-skiing

List of all current ski lifts

Telefèric Arinsal-Pal (YOC 2000)

50pers. Aerial tramway/Reversible ropeway
Length: 2414 m · Carrying capacity/hour: 500
Manufacturer: Doppelmayr

Telecabina de La Massana (YOC 2004)

16pers. Gondola lift (bicable circulating ropeway)
Length: 2200 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr

Telecabina Els Orriols (YOC 1997)

6pers. Gondola lift (monocable circulating ropeway)
Length: 1126 m · Carrying capacity/hour: 1500
Manufacturer: Poma

Josep Serra (YOC 2008)

6pers. High speed chairlift (detachable)
Length: 905 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

El Cubil (YOC 2007)

6pers. High speed chairlift (detachable)
Length: 1376 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr

Les Fonts (YOC 2005)

6pers. High speed chairlift (detachable)
Length: 1600 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr

Setúria (YOC 1999)

4pers. High speed chairlift (detachable)
Length: 1100 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

La Serra II (YOC 1997)

4pers. High speed chairlift (detachable)
Length: 1148 m · Carrying capacity/hour: 2400
Manufacturer: Poma

El Cortal (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 437 m · Carrying capacity/hour: 2000
Manufacturer: Poma

Port Negre (YOC 1997)

4pers. Chairlift (fixed-grip)
Length: 1332 m · Carrying capacity/hour: 2400
Manufacturer: Poma

La Carbonera (YOC 1997)

4pers. Chairlift (fixed-grip)
Length: 450 m · Carrying capacity/hour: 2400
Manufacturer: Poma

La Botella

4pers. Chairlift (fixed-grip)
Length: 1050 m · Carrying capacity/hour: 2000

La Tossa

4pers. Chairlift (fixed-grip)
Length: 600 m · Carrying capacity/hour: 2000

La Serra

2pers. Chairlift (fixed-grip)
Length: 900 m · Carrying capacity/hour: 1000

La Caubella

2pers. Chairlift (fixed-grip)
Length: 300 m · Carrying capacity/hour: 1000

La Serra

J-bar
Length: 1000 m · Carrying capacity/hour: 800
Manufacturer: Poma

El Cubil

J-bar
Length: 600 m · Carrying capacity/hour: 800
Manufacturer: Poma

Els Coms

J-bar
Length: 400 m · Carrying capacity/hour: 800
Manufacturer: Poma

La Tossa I

J-bar
Length: 250 m · Carrying capacity/hour: 800
Manufacturer: Poma

La Tossa II

J-bar
Length: 250 m · Carrying capacity/hour: 800
Manufacturer: Poma

Els Planells

J-bar
Length: 400 m · Carrying capacity/hour: 800
Manufacturer: Poma

El Coll

J-bar
Length: 480 m · Carrying capacity/hour: 800
Manufacturer: Poma

La Capa

J-bar
Length: 510 m · Carrying capacity/hour: 800
Manufacturer: Poma

Feedback for the Skiresort.info Team? Please use this form »
Tips for the ski holiday