Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Söllereckbahn - 6pers. Gondola lift (monocable circulating ropeway)

All lifts/cable cars Oberstdorf/Soellereck

Directly to:

The modern 6-person Soellereck gondola lift connects almost all of the slopes. Otherwise there are t-bar lifts in the ski resort, including the Hoellwies lift - one of the longest t-bar lifts in Germany with a length of almost 2 km.

Number of ski lifts

  • 5

Total capacity

5690 Passengers/hour

Total lift length

5.4 km Total

1 Circulating ropeway/gondola lift
1 6pers. Gondola lift (monocable circulating ropeway)
4 T-bar lift/platter/button lift
4 T-bar

Other types of ascension mechanisms

2 Sunkid Moving Carpet      Further information about Sunkid

Planned ski lifts

planned: Höllwies-Express

6pers. High speed chairlift (detachable)
Length: 1980 m · Carrying capacity/hour: 2600
Replacement lift: T-bar

List of all current ski lifts

Söllereckbahn (YOC 1997)

6pers. Gondola lift (monocable circulating ropeway)
Length: 1995 m · Carrying capacity/hour: 1690
Manufacturer: Doppelmayr
Replacement lift: 2pers. High speed chairlift (detachable)

Ochsenhöflelift (YOC 1979)

T-bar
Length: 354 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr

Höllwieslift (YOC 1975)

T-bar
Length: 1972 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr
Replacement lift: J-bar

Schrattenwanglift (YOC 1969)

T-bar
Length: 631 m · Carrying capacity/hour: 1000
Manufacturer: Heuss

Wannenköpflelift

T-bar
Length: 412 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr

Feedback for the Skiresort.info Team? Please use this form »
Tips for the ski holiday