Almost all of the slopes can be accessed with the 2 combination lifts. There are also 4 t-bar lifts that connect the slopes beneath the Alpspitze.
Alpspitzbahn II (YOC 2010)
Combined installation (4 pers. chair and 8 pers. gondola)
Length: 880 m · Carrying capacity/hour: 1300
Manufacturer: Doppelmayr
Replacement lift: 1pers. Chairlift (fixed-grip)
Alpspitzbahn II (YOC 2010)
Combined installation (4 pers. chair and 8 pers. gondola)
Length: 880 m · Carrying capacity/hour: 1300
Manufacturer: Doppelmayr
Replacement lift: 1pers. Chairlift (fixed-grip)
Alpspitzbahn I (YOC 2006)
Combined installation (4 pers. chair and 8 pers. gondola)
Length: 1256 m · Carrying capacity/hour: 1600
Manufacturer: Doppelmayr
Rodellift G (Reserve) (YOC 1950)
1pers. Chairlift (fixed-grip)
Length: 630 m · Carrying capacity/hour: 400
Manufacturer: Heuss
Familienlift
T-bar
Length: 260 m · Carrying capacity/hour: 800
Kronenlift
T-bar
Length: 1100 m · Carrying capacity/hour: 800
Manufacturer: Doppelmayr
Stellenbichllift
T-bar
Length: 1300 m · Carrying capacity/hour: 800
Manufacturer: Doppelmayr
Übungslift
J-bar
Length: 200 m · Carrying capacity/hour: 600
iPhone
New: Android