Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Tscheyeckbahn - 6pers. High speed chairlift (detachable) with bubble

All lifts/cable cars Nauders on the Resia Pass/Bergkastel

Directly to:

A 6 person gondola lift leads up from the valley to the ski resort. Almost the entire Bergkastel ski resort is accessed with high performance and comfortable chair lifts (one with weather protectors). Some short t-bar lifts are only necessary as connection lifts. By the way, the first 8 person chair lift was put into use in Nauders.

Number of ski lifts

  • 14

Total capacity

18951 Passengers/hour

Total lift length

15.2 km Total

1 Circulating ropeway/gondola lift
1 6pers. Gondola lift (monocable circulating ropeway)
6 Chairlift
1 8pers. High speed chairlift (detachable)
1 6pers. High speed chairlift (detachable) with bubble
1 6pers. High speed chairlift (detachable)
3 2pers. Chairlift (fixed-grip)
6 T-bar lift/platter/button lift
5 T-bar
1 J-bar
1 Rope tow/beginner lift

Other types of ascension mechanisms

3 Sunkid Moving Carpet      Further information about Sunkid

List of all current ski lifts

Bergkastelseilbahn (YOC 1974)

6pers. Gondola lift (monocable circulating ropeway)
Length: 2840 m · Carrying capacity/hour: 2270
Manufacturer: Doppelmayr

Zirmbahn (YOC 1999)

8pers. High speed chairlift (detachable)
Length: 1159 m · Carrying capacity/hour: 3204
Manufacturer: Doppelmayr

Tscheyeckbahn (YOC 2000)

6pers. High speed chairlift (detachable) with bubble
Length: 2231 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Gaislochbahn (YOC 2005)

6pers. High speed chairlift (detachable)
Length: 1216 m · Carrying capacity/hour: 2540
Manufacturer: Doppelmayr
Replacement lift: T-bar

Lärchenhang II (YOC 2000)

2pers. Chairlift (fixed-grip)
Length: 1370 m · Carrying capacity/hour: 817
Manufacturer: Doppelmayr

Mutzkopf (YOC 1987)

2pers. Chairlift (fixed-grip)
Length: 1007 m · Carrying capacity/hour: 800
Manufacturer: Doppelmayr

Lärchenhang I (YOC 1986)

2pers. Chairlift (fixed-grip)
Length: 1592 m · Carrying capacity/hour: 1450
Manufacturer: Doppelmayr

Panoramalift (YOC 1989)

T-bar
Length: 400 m · Carrying capacity/hour: 750
Manufacturer: Doppelmayr

Ganderbildlift (YOC 1982)

T-bar
Length: 600 m · Carrying capacity/hour: 900
Manufacturer: Doppelmayr

Almlift (YOC 1978)

T-bar
Length: 1200 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr

Goldseelift (YOC 1974)

T-bar
Length: 600 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr

Ideallift

T-bar
Length: 450 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr

Tallift (YOC 2005)

J-bar
Length: 418 m · Carrying capacity/hour: 720
Manufacturer: Doppelmayr

Übungslift

Rope tow/beginner lift
Length: 100 m · Carrying capacity/hour: 500

Feedback for the Skiresort.info Team? Please use this form »
Tips for the ski holiday