Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)

New at Moelltal Glacier

2013/2014


NEW determination of slope length

We as the Schultz Gruppe, as well as all lift companies, welcome the initiative for a European-wide and transparent process for the determination of slope lengths.

We have reevaluated and redetermined the effective length of our slopes (diagonal line) according to the recommendation of the Austrian Cable Car Association from 28.May 2013.

The reduction in slope kilometers results from the previous inclusion of cross slopes and the combination of various slope possibilities as well as the multiple use of extra-wide slopes due to a lack of a uniform rules.

We emphasize that the reduction is only due to the calculation method and that no slopes have been taken away. On the contrary, we are committed to the further expansion and modernization of the slopes and lifts in our ski resort.


2011/2012


Alteck

4pers. Chairlift (fixed-grip)

Alteck

Expansion of the slope offering by 20 km

New "Alteck" quad chairlift with +40% more slopes since autumn of 2011!!


2002/2003


Opening of the new Eissee Glaspalast-Restaurant Eissee

with a sun terrace at 2800 m


2001/2002


Gletscherjet 3000

6pers. High speed chairlift (detachable) with bubble

Gletscherjet 3000

2000/2001


Panoramabahn Klühspies

2pers. Chairlift (fixed-grip)

Panoramabahn Klühspies

1997/1998


Schwarzkopfbahn

4pers. Chairlift (fixed-grip)

Schwarzkopfbahn

Sesselbahn 3000er

2pers. Chairlift (fixed-grip)

Sesselbahn 3000er

1996/1997


Mölltaler Gletscher Express

220pers. Funicular

Mölltaler Gletscher Express

1986/1987


Gondelbahn Eissee

6pers. Gondola lift (monocable circulating ropeway)

Gondelbahn Eissee

Feedback for the Skiresort.info Team? Please use this form »