United Kingdom
  • Glencoe Mountain
    • Worldwide
    • Europe
    • United Kingdom
    • Scotland
    • Highlands
Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)

All lifts/cable cars Glencoe Mountain

Number of ski lifts

  • 8

Total capacity

5800 Passengers/hour

Total lift length

4.1 km Total

1 2pers. Chairlift (fixed-grip)
1 1pers. Chairlift (fixed-grip)
2 T-bar
3 J-bar
1 Rope tow/beginner lift

New ski lifts

Coire Pollach Tow (YOC 2015)

J-bar
Length: 375 m · Carrying capacity/hour: 700
Manufacturer: Doppelmayr

Planned ski lifts

planned: Skyfall Chair (YOC 2017)

3pers. Chairlift (fixed-grip)
Length: 800 m · Carrying capacity/hour: 1500
Manufacturer: Doppelmayr

List of all current ski lifts

Access Chairlift

2pers. Chairlift (fixed-grip)
Length: 700 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr

Cliffhanger Chairlift (YOC 1960)

1pers. Chairlift (fixed-grip)
Length: 550 m · Carrying capacity/hour: 500
Manufacturer: Riblet

Main Basin T-bar

T-bar
Length: 600 m · Carrying capacity/hour: 800

The Wall T-bar

T-bar
Length: 550 m · Carrying capacity/hour: 800

Coire Pollach Tow (YOC 2015)

J-bar
Length: 375 m · Carrying capacity/hour: 700
Manufacturer: Doppelmayr

Rannoch Button

J-bar
Length: 600 m · Carrying capacity/hour: 700

Plateau Poma

J-bar
Length: 500 m · Carrying capacity/hour: 800
Manufacturer: Poma

Beginners Tow

Rope tow/beginner lift
Length: 200 m · Carrying capacity/hour: 500

Feedback for the Skiresort.info Team? Please use this form »
Tips for the ski holiday