Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)

All lifts/cable cars Falcade/Passo San Pellegrino (Trevalli)

Directly to:

Number of ski lifts

  • 19

Total capacity

24840 Passengers/hour

Total lift length

18.8 km Total

1 Aerial tramway/reversible ropeway
1 96pers. Aerial tramway/Reversible ropeway
10 Chairlift
3 4pers. High speed chairlift (detachable) with bubble
6 4pers. Chairlift (fixed-grip)
1 2pers. Chairlift (fixed-grip)
8 T-bar lift/platter/button lift
8 J-bar
List of all current ski lifts

Col Margherita (Bj. 2001)

96pers. Aerial tramway/Reversible ropeway
Length: 1395 m · Carrying capacity/hour: 1330
Manufacturer: Leitner

Saline Laresei (Bj. 2005)

4pers. High speed chairlift (detachable) with bubble
Length: 1423 m · Carrying capacity/hour: 800
Manufacturer: Doppelmayr

Costabella (Bj. 2005)

4pers. High speed chairlift (detachable) with bubble
Length: 1620 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr

Cavia Col Margherita (Bj. 1999)

4pers. High speed chairlift (detachable) with bubble
Length: 2028 m · Carrying capacity/hour: 1800
Manufacturer: Agamatic

Cavia Laresei (Bj. 2003)

4pers. Chairlift (fixed-grip)
Length: 308 m · Carrying capacity/hour: 1490
Manufacturer: Doppelmayr

Campigol (Bj. 1999)

4pers. Chairlift (fixed-grip)
Length: 531 m · Carrying capacity/hour: 1600
Manufacturer: Leitner

Del Passo (Bj. 1997)

4pers. Chairlift (fixed-grip)
Length: 395 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Buse Laresei (Bj. 1990)

4pers. Chairlift (fixed-grip)
Length: 1207 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

Gigante (Bj. 1989)

4pers. Chairlift (fixed-grip)
Length: 1559 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

Molino Le Buse (Bj. 1986)

4pers. Chairlift (fixed-grip)
Length: 1918 m · Carrying capacity/hour: 1800
Manufacturer: Leitner

Cima Uomo (Bj. 1999)

2pers. Chairlift (fixed-grip)
Length: 738 m · Carrying capacity/hour: 1200
Manufacturer: Leitner
Replacement lift: J-bar

Paradiso 2 (Bj. 2004)

J-bar
Length: 1020 m · Carrying capacity/hour: 810
Manufacturer: Leitner
Replacement lift: J-bar

Paradiso 1 (Bj. 2004)

J-bar
Length: 1020 m · Carrying capacity/hour: 810
Manufacturer: Leitner
Replacement lift: J-bar

Capanna Margherita (Bj. 2002)

J-bar
Length: 407 m · Carrying capacity/hour: 900
Manufacturer: Leitner
Replacement lift: J-bar

Chiesetta 2 (Bj. 2002)

J-bar
Length: 743 m · Carrying capacity/hour: 830
Manufacturer: Leitner
Replacement lift: J-bar

Chiesetta 1 (Bj. 2001)

J-bar
Length: 741 m · Carrying capacity/hour: 830
Manufacturer: Leitner
Replacement lift: J-bar

Le Buse Scuola sx (Bj. 1967)

J-bar
Length: 800 m · Carrying capacity/hour: 720
Manufacturer: Leitner

Le Buse Scuola dx (Bj. 1967)

J-bar
Length: 800 m · Carrying capacity/hour: 720
Manufacturer: Leitner

Scoiattolo

J-bar
Length: 120 m · Carrying capacity/hour: 600
Manufacturer: Leitner

Feedback for the Skiresort.info Team? Please use this form »
Tips for the ski holiday