Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)

All lifts/cable cars Etna Nord/Linguaglossa

Directly to:

Number of ski lifts

  • 4

Total capacity

3481 Passengers/hour

Total lift length

4.8 km Total

1 Chairlift
1 4pers. High speed chairlift (detachable) with bubble
3 T-bar lift/platter/button lift
3 J-bar

New ski lifts

Coccinelle (YOC 2012)

J-bar
Length: 1078 m · Carrying capacity/hour: 720
Manufacturer: Leitner
Replacement lift: J-bar

List of all current ski lifts

Pouchoz-Tanaurpi (YOC 2008)

4pers. High speed chairlift (detachable) with bubble
Length: 1319 m · Carrying capacity/hour: 1161
Manufacturer: Leitner
Replacement lift: T-bar

Coccinelle (YOC 2012)

J-bar
Length: 1078 m · Carrying capacity/hour: 720
Manufacturer: Leitner
Replacement lift: J-bar

Monte Conca (YOC 2011)

J-bar
Length: 1341 m · Carrying capacity/hour: 800
Manufacturer: Leitner
Replacement lift: J-bar

Anfiteatro (YOC 2006)

J-bar
Length: 1102 m · Carrying capacity/hour: 800
Manufacturer: Graffer

Feedback for the Skiresort.info Team? Please use this form »
Test Reports


Slope preparation
Environmentally friendly ski operation

All test reports
Tips for the ski holiday