A newly built child safety 6-person chairlift with weather protectors, a triple chairlift and 4 t-bar lifts provide access to the ski area. The modernization of further lifts is planned in the coming years.
Sonnenhang Sunracer (YOC 2012)
6pers. High speed chairlift (detachable) with bubble
Length: 1373 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: T-bar
Gamskar-Bahn (YOC 2013)
Combined installation (6 pers. chair and 8 pers. gondola)
Length: 2030 m · Carrying capacity/hour: 2000
Replacement lift: T-bar
Sonnenhang Sunracer (YOC 2012)
6pers. High speed chairlift (detachable) with bubble
Length: 1373 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: T-bar
Wettersteinbahn (YOC 1999)
3pers. High speed chairlift (detachable)
Length: 1522 m · Carrying capacity/hour: 1305
Manufacturer: Doppelmayr
Replacement lift: T-bar
Bärengrube
T-bar
Length: 1400 m · Carrying capacity/hour: 1100
Manufacturer: Doppelmayr
Gamskarlift
T-bar
Length: 900 m · Carrying capacity/hour: 1200
Manufacturer: Steurer
Skischullift Sonnenhang
T-bar
Length: 240 m · Carrying capacity/hour: 920
Manufacturer: Doppelmayr
Babylift Sonnenhang
Rope tow/ beginner lift
Length: 170 m · Carrying capacity/hour: 500
iPhone
New: Android