Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)

All lifts/cable cars Cauterets/Le Lys

Directly to:

Number of ski lifts

  • 9

Total capacity

13938 Passengers/hour

Total lift length

11.3 km Total

2 Circulating ropeway/gondola lift
1 8pers. Gondola lift (monocable circulating ropeway)
1 4pers. Gondola lift (monocable circulating ropeway)
4 Chairlift
1 6pers. High speed chairlift (detachable)
3 4pers. Chairlift (fixed-grip)
3 T-bar lift/platter/button lift
3 J-bar

Other types of ascension mechanisms

3 People mover
List of all current ski lifts

Le Lys (Bj. 2005)

8pers. Gondola lift (monocable circulating ropeway)
Length: 3745 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

COURBET (Bj. 1976)

4pers. Gondola lift (monocable circulating ropeway)
Length: 1044 m · Carrying capacity/hour: 900
Manufacturer: Poma

Les Crêtes (Bj. 2004)

6pers. High speed chairlift (detachable)
Length: 1869 m · Carrying capacity/hour: 2600
Manufacturer: Poma

GRAND BARBAT (Bj. 1997)

4pers. Chairlift (fixed-grip)
Length: 1337 m · Carrying capacity/hour: 2208
Manufacturer: GMM Gimar Montaz Mautino

BRECHE (Bj. 1989)

4pers. Chairlift (fixed-grip)
Length: 1332 m · Carrying capacity/hour: 1800
Manufacturer: Poma

TOUYAROLLES (Bj. 1989)

4pers. Chairlift (fixed-grip)
Length: 824 m · Carrying capacity/hour: 1800
Manufacturer: Poma

SOURCE (Bj. 1984)

J-bar
Length: 372 m · Carrying capacity/hour: 900
Manufacturer: Poma

DEBUTANTS (Bj. 1965)

J-bar
Length: 222 m · Carrying capacity/hour: 900
Manufacturer: Poma

Baumes (Bj. 1964)

J-bar
Length: 590 m · Carrying capacity/hour: 830
Manufacturer: Poma

Feedback for the Skiresort.info Team? Please use this form »
Test Reports

Mountain restaurants, ski huts, gastronomy
Lifts and cable cars


Slope offering, run variety
Families and children

All test reports
Tips for the ski holiday