Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Bormio-Bormio 2000 - 8pers. Gondola lift (monocable circulating ropeway)

All lifts/cable cars Bormio/Cima Bianca

Directly to:

Guests access Bormio 2000 using a modern 8 person gondola lift leading up from the valley. The upper part of the ski resort is connected with modern chair lifts (most with weather protectors). There are also j-bars and people movers available for beginners.

Number of ski lifts

  • 11

Total capacity

17630 Passengers/hour

Total lift length

14.9 km Total

1 Aerial tramway/reversible ropeway
1 75pers. Aerial tramway/Reversible ropeway
1 Circulating ropeway/gondola lift
1 8pers. Gondola lift (monocable circulating ropeway)
5 Chairlift
3 4pers. High speed chairlift (detachable) with bubble
1 4pers. Chairlift (fixed-grip)
1 3pers. Chairlift (fixed-grip)
4 T-bar lift/platter/button lift
4 J-bar

Other types of ascension mechanisms

4 Sunkid Moving Carpet      Further information about Sunkid
New ski lifts

Bormio 2000-Cima Bianca (Bj. 2013)

75pers. Aerial tramway/Reversible ropeway
Length: 3283 m · Carrying capacity/hour: 320
Manufacturer: Poma
Replacement lift: 75pers. Aerial tramway/Reversible ropeway
List of all current ski lifts

Bormio 2000-Cima Bianca (Bj. 2013)

75pers. Aerial tramway/Reversible ropeway
Length: 3283 m · Carrying capacity/hour: 320
Manufacturer: Poma
Replacement lift: 75pers. Aerial tramway/Reversible ropeway

Bormio-Bormio 2000 (Bj. 2003)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2439 m · Carrying capacity/hour: 2800
Manufacturer: Leitner

Valbella-Bormio 3000 (Bj. 2004)

4pers. High speed chairlift (detachable) with bubble
Length: 1736 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

Fontanalonga-Valbella (Bj. 2004)

4pers. High speed chairlift (detachable) with bubble
Length: 1777 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

Bormio 2000-Cimino (Bj. 2001)

4pers. High speed chairlift (detachable) with bubble
Length: 1731 m · Carrying capacity/hour: 2000
Manufacturer: Agamatic

Ciuk-Laghetti (Bj. 1999)

4pers. Chairlift (fixed-grip)
Length: 901 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Bormio 2000-Pian dei Larici (Bj. 1995)

3pers. Chairlift (fixed-grip)
Length: 944 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr

Rocca Est (Bj. 1998)

J-bar
Length: 848 m · Carrying capacity/hour: 900
Manufacturer: Doppelmayr

Nevada Ovest (Bj. 1998)

J-bar
Length: 600 m · Carrying capacity/hour: 900
Manufacturer: Leitner

Nevada Est

J-bar
Length: 296 m · Carrying capacity/hour: 810
Manufacturer: Leitner

Baby 2000

J-bar
Length: 340 m · Carrying capacity/hour: 900
Manufacturer: Leitner

Feedback for the Skiresort.info Team? Please use this form »
Test Reports
Tips for the ski holiday