Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Marienberg 1 - 6pers. High speed chairlift (detachable)

All lifts/cable cars Biberwier/Marienberg

Directly to:

The lower section of slopes (blue valley run) is accessible with a modern 6-person chairlift. A double chairlift leads up to the Marienbergjoch and there are also 3 t-bars.

Number of ski lifts

  • 5

Total capacity

7040 Passengers/hour

Total lift length

4.8 km Total

2 Chairlift
1 6pers. High speed chairlift (detachable)
1 2pers. Chairlift (fixed-grip)
3 T-bar lift/platter/button lift
3 T-bar

Other types of ascension mechanisms

1 Sunkid Moving Carpet      Further information about Sunkid
Planned ski lifts

planned: Verbindungsbahn Lermoos-Biberwier

80pers. Funifor - wind stable ropeway with wide rope gauge
Length: 3000 m · Carrying capacity/hour: 1000

planned: Marienberg 2 (Bj. 2015)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1500 m · Carrying capacity/hour: 2400
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Marienberg 1

10pers. Gondola lift (monocable circulating ropeway)
Length: 1000 m · Carrying capacity/hour: 2400
Replacement lift: 6pers. High speed chairlift (detachable)
List of all current ski lifts

Marienberg 1 (Bj. 2000)

6pers. High speed chairlift (detachable)
Length: 1000 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 1pers. Chairlift (fixed-grip)
T-bar

Marienberg 2 (Bj. 1988)

2pers. Chairlift (fixed-grip)
Length: 1563 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr

Almlift

T-bar
Length: 730 m · Carrying capacity/hour: 1038
Manufacturer: Doppelmayr

Jochlift

T-bar
Length: 730 m · Carrying capacity/hour: 1102
Manufacturer: Doppelmayr

Schöner Hang

T-bar
Length: 750 m · Carrying capacity/hour: 1300
Manufacturer: Doppelmayr

Feedback for the Skiresort.info Team? Please use this form »