Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Senderbahn Sektion II - 8pers. Gondola lift with seat heating (monocable circulating ropeway)

All lifts/cable cars Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel

Directly to:

In the last few years, investments have been made in the expansion and improvement of the lift facilities in Gastein. There are mainly modern lifts in the ski resort. The feeder lifts on the Schlossalm are on the list of lifts to be modernized in the next years.

Number of ski lifts

  • 20

Total capacity

32699 Passengers/hour

Total lift length

22.2 km Total

1 Funicular
1 120pers. Funicular
1 Aerial tramway/reversible ropeway
1 80pers. Aerial tramway/Reversible ropeway
5 Circulating ropeway/gondola lift
4 8pers. Gondola lift with seat heating (monocable circulating ropeway)
1 8pers. Gondola lift (monocable circulating ropeway)
9 Chairlift
1 6pers. High speed chairlift (detachable) with seat heating
2 4pers. High speed chairlift (detachable) with bubble
1 4pers. High speed chairlift (detachable)
1 4pers. Chairlift (fixed-grip)
3 2pers. Chairlift (fixed-grip)
1 1pers. Chairlift (fixed-grip)
3 T-bar lift/platter/button lift
3 T-bar
1 Rope tow/beginner lift

Other types of ascension mechanisms

6 Sunkid Moving Carpet      Further information about Sunkid
New ski lifts

Übungslift Rossalm (Bj. 2014)

Rope tow/beginner lift
Length: 120 m · Carrying capacity/hour: 500
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Gastein)
Planned ski lifts

planned: Schlossalmbahn (Bj. 2015)

10pers. Gondola lift (monocable circulating ropeway)
Length: 3422 m · Carrying capacity/hour: 3000
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Hofgastein)
Replacement lift: 120pers. Funicular

planned: Sendleitenbahn (Bj. 2015)

8pers. High speed chairlift (detachable)
Length: 1240 m · Carrying capacity/hour: 4000
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Hofgastein)
Replacement lift: 4pers. High speed chairlift (detachable)
List of all current ski lifts

Schlossalmbahn I (Bj. 1984)

120pers. Funicular
Length: 1265 m · Carrying capacity/hour: 1660
Manufacturer: Leitner
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Hofgastein)

Schlossalmbahn II (Bj. 1996)

80pers. Aerial tramway/Reversible ropeway
Length: 2157 m · Carrying capacity/hour: 820
Manufacturer: Leitner
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Hofgastein)

Stubnerkogelbahn I (Bj. 2009)

8pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 1593 m · Carrying capacity/hour: 2790
Manufacturer: Doppelmayr
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Gastein)
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)

Stubnerkogelbahn II (Bj. 2009)

8pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 1043 m · Carrying capacity/hour: 2790
Manufacturer: Doppelmayr
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Gastein)
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)

Senderbahn Sektion II (Bj. 2008)

8pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 1975 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Gastein)

Senderbahn Sektion I (Bj. 2008)

8pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 759 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Gastein)

Kaserebenbahn (Bj. 1999)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2063 m · Carrying capacity/hour: 1920
Manufacturer: Doppelmayr
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Hofgastein)
Replacement lift: 2pers. Chairlift (fixed-grip)
T-bar

Weitmoserbahn (Bj. 2001)

6pers. High speed chairlift (detachable) with seat heating
Length: 933 m · Carrying capacity/hour: 2125
Manufacturer: Doppelmayr
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Hofgastein)
Replacement lift: T-bar
T-bar

Angertalbahn (Bj. 2002)

4pers. High speed chairlift (detachable) with bubble
Length: 1664 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Gastein)
Replacement lift: 3pers. High speed chairlift (detachable)

Sendleitenbahn (Bj. 1992)

4pers. High speed chairlift (detachable) with bubble
Length: 1238 m · Carrying capacity/hour: 2200
Manufacturer: Girak
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Hofgastein)

Jungeralm (Bj. 1984)

4pers. High speed chairlift (detachable)
Length: 1656 m · Carrying capacity/hour: 1500
Manufacturer: Doppelmayr
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Gastein)

Kleine Scharte (Bj. 1986)

4pers. Chairlift (fixed-grip)
Length: 1044 m · Carrying capacity/hour: 2400
Manufacturer: Swoboda
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Hofgastein)

Bucheben (Bj. 2001)

2pers. Chairlift (fixed-grip)
Length: 653 m · Carrying capacity/hour: 1000
Manufacturer: Garaventa
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Gastein)

Hohe Scharte (Bj. 1995)

2pers. Chairlift (fixed-grip)
Length: 776 m · Carrying capacity/hour: 1434
Manufacturer: Garaventa
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Hofgastein)
Replacement lift: 2pers. Chairlift (fixed-grip)

Haitzingalm (Bj. 1970)

2pers. Chairlift (fixed-grip)
Length: 1346 m · Carrying capacity/hour: 1440
Manufacturer: Girak
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Hofgastein)
Replacement lift: T-bar

Bellevuealm (Bj. 1948)

1pers. Chairlift (fixed-grip)
Length: 426 m · Carrying capacity/hour: 220
Manufacturer: Steurer
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Gastein)

Schloßhochalmlift (Bj. 1968)

T-bar
Length: 548 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Hofgastein)

Burgstalllift

T-bar
Length: 693 m · Carrying capacity/hour: 1100
Manufacturer: Doppelmayr
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Gastein)

Übungslift Angertal (Judau)

T-bar
Length: 222 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Gastein)

Übungslift Rossalm (Bj. 2014)

Rope tow/beginner lift
Length: 120 m · Carrying capacity/hour: 500
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Gastein)

Feedback for the Skiresort.info Team? Please use this form »
Tips for the ski holiday