Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)

All lifts/cable cars Alpiaz/Montecampione

Directly to:

Number of ski lifts

  • 11

Total capacity

15404 Passengers/hour

Total lift length

9.6 km Total

9 Chairlift
1 4pers. High speed chairlift (detachable) with bubble
1 4pers. Chairlift (fixed-grip)
3 3pers. Chairlift (fixed-grip)
4 2pers. Chairlift (fixed-grip)
2 T-bar lift/platter/button lift
2 T-bar

List of all current ski lifts

Preottone Monte Corniole (YOC 2002)

4pers. High speed chairlift (detachable) with bubble
Length: 1915 m · Carrying capacity/hour: 1800
Manufacturer: Poma

Le Baite (YOC 1994)

4pers. Chairlift (fixed-grip)
Length: 1019 m · Carrying capacity/hour: 2000
Manufacturer: Leitner
Replacement lift: T-bar

Gardena (YOC 1993)

3pers. Chairlift (fixed-grip)
Length: 290 m · Carrying capacity/hour: 1800
Manufacturer: Leitner

Plan Larice (YOC 1991)

3pers. Chairlift (fixed-grip)
Length: 721 m · Carrying capacity/hour: 1800
Manufacturer: Leitner

Val Maione-Marucolo (YOC 1991)

3pers. Chairlift (fixed-grip)
Length: 845 m · Carrying capacity/hour: 1800
Manufacturer: Leitner

Dosso Rotondo (YOC 2010)

2pers. Chairlift (fixed-grip)
Length: 889 m · Carrying capacity/hour: 1200
Manufacturer: Sacif
Replacement lift: T-bar

Plan-Dosso delle Beccherie (YOC 1982)

2pers. Chairlift (fixed-grip)
Length: 1019 m · Carrying capacity/hour: 1028
Manufacturer: Leitner

Monte Secondino-Monte Splaza (YOC 1979)

2pers. Chairlift (fixed-grip)
Length: 1130 m · Carrying capacity/hour: 1028
Manufacturer: Leitner

Monte Splaza (YOC 1978)

2pers. Chairlift (fixed-grip)
Length: 602 m · Carrying capacity/hour: 1028
Manufacturer: Leitner

Campo Scuola (YOC 1985)

T-bar
Length: 325 m · Carrying capacity/hour: 720
Manufacturer: Leitner

Del Longarino (YOC 1978)

T-bar
Length: 875 m · Carrying capacity/hour: 1200
Manufacturer: Leitner

Feedback for the Skiresort.info Team? Please use this form »
Test Reports
Tips for the ski holiday