Change lift info:

Valais (Wallis): planned lifts

All planned lifts in the Canton of Valais (Wallis) - Lift projects at ski resorts in the Canton of Valais (Wallis) (renewal, development and integration)


Overview: planned ski lifts in the Canton of Valais (Wallis)

Total: 17
4
5
1
6
1

Add lifts and cable cars? Please report here


See also:
New lifts 2017/2018



Map: planned ski lifts in the Canton of Valais (Wallis)

Show map
Valais (Wallis) – limit to

Valais (Wallis) – switch to

Valais (Wallis): planned ski lifts

1-10 out of 10 ski resorts

planned: Lauchernalp-Stafel (YOC 2017)

6pers. High speed chairlift (detachable)
Length: 610 m · Carrying capacity/hour: 1800
Manufacturer: Bartholet BMF
Replacement lift: 2pers. Chairlift (fixed-grip)
T-bar
All lifts

planned: Zermatt-Furi (YOC 2018)

100pers. Aerial tramway/Reversible ropeway
Length: 1715 m · Carrying capacity/hour: 1000
Manufacturer: Garaventa
Ski resort: Zermatt/Breuil-Cervinia/Valtournenche – Matterhorn [Zermatt]
Replacement lift: 85pers. Aerial tramway/Reversible ropeway

planned: Testa Grigia - Matterhorn glacier paradise (YOC 2018)

100pers. Aerial tramway/Reversible ropeway
Length: 1500 m · Carrying capacity/hour: 1000
Manufacturer: Garaventa
Ski resort: Zermatt/Breuil-Cervinia/Valtournenche – Matterhorn [Zermatt]

planned: Trockener Steg–Matterhorn glacier paradise (YOC 2018)

28pers. Tricable ropeway
Length: 3800 m · Carrying capacity/hour: 2000
Manufacturer: Leitner
Ski resort: Zermatt/Breuil-Cervinia/Valtournenche – Matterhorn [Zermatt]

planned: Furgg-Garten

6pers. High speed chairlift (detachable) with bubble
Length: 1500 m · Carrying capacity/hour: 2400
Ski resort: Zermatt/Breuil-Cervinia/Valtournenche – Matterhorn [Zermatt]

planned: Breitboden-Rosenritz

4pers. High speed chairlift (detachable)
Length: 2000 m · Carrying capacity/hour: 2400
Ski resort: Zermatt/Breuil-Cervinia/Valtournenche – Matterhorn [Zermatt]
All lifts

planned: Esserts–Planards–Savoleyres (YOC 2017)

Combined installation (6 pers. chair and 10 pers. gondola) with seat heating
Length: 2100 m · Carrying capacity/hour: 2100
Ski resort: 4 Vallées – Verbier/​La Tzoumaz/​Nendaz/​Veysonnaz/​Thyon [Verbier]
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)
T-bar
All lifts

planned: Morgins-La Foilleuse

6pers. High speed chairlift (detachable)
Length: 1404 m · Carrying capacity/hour: 2400
Ski resort: Les Portes du Soleil – Morzine/​Avoriaz/​Les Gets/​Châtel/​Morgins/​Champéry [Morgins]
Replacement lift: 3pers. High speed chairlift (detachable)
All lifts

planned: P2-Kalbermatten

10pers. Gondola lift (monocable circulating ropeway)
Length: 400 m · Carrying capacity/hour: 2000
Manufacturer: Garaventa

planned: Spielboden-Längfluh

10pers. Gondola lift (monocable circulating ropeway)
Length: 940 m · Carrying capacity/hour: 2000
Manufacturer: Garaventa

planned: Längfluh-Feechopf

10pers. Gondola lift (monocable circulating ropeway)
Length: 3000 m · Carrying capacity/hour: 2000
Manufacturer: Garaventa
All lifts

planned: Aminona-Colombire-Grangettes (YOC 2017)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2000 m · Carrying capacity/hour: 2000
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)
All lifts

planned: Plattja (YOC 2017)

4pers. High speed chairlift (detachable)
Length: 1400 m · Carrying capacity/hour: 2000
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

planned: Ober Senntum-Alststafelhorn (YOC 2017)

T-bar
Length: 1200 m · Carrying capacity/hour: 1000
All lifts

planned: Eischoll-Stryggen (YOC 2017)

4pers. Chairlift (fixed-grip)
Length: 995 m · Carrying capacity/hour: 1500
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

planned: Stalden-Staldenried (YOC 2018)

25pers. Aerial tramway/Reversible ropeway
Length: 1164 m · Carrying capacity/hour: 270
Manufacturer: Steurer
Replacement lift: 12pers. Aerial tramway/Reversible ropeway

planned: Staldenried-Gspon (YOC 2018)

25pers. Aerial tramway/Reversible ropeway
Length: 1598 m · Carrying capacity/hour: 230
Manufacturer: Steurer
Replacement lift: 12pers. Aerial tramway/Reversible ropeway
All lifts
1-10 out of 10 ski resorts