Change lift info:

Upper Bavaria (Oberbayern): planned lifts

All planned lifts in Upper Bavaria (Oberbayern) - Lift projects at ski resorts in Upper Bavaria (Oberbayern) (renewal, development and integration)


Overview: planned ski lifts in Upper Bavaria (Oberbayern)

Total: 7
3
4

Add lifts and cable cars? Please report here


See also:
New lifts 2017/2018



Map: planned ski lifts in Upper Bavaria (Oberbayern)

Show map
Upper Bavaria (Oberbayern) – limit to

Upper Bavaria (Oberbayern) – switch to

Upper Bavaria (Oberbayern): planned ski lifts

1-4 out of 4 ski resorts

planned: Bayrischzell-Sudelfeld (YOC 2018)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1450 m · Carrying capacity/hour: 2000
Replacement lift: 1pers. Chairlift (fixed-grip)
All lifts

planned: Jennerbahn I (YOC 2018)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1822 m · Carrying capacity/hour: 1600
Manufacturer: Leitner
Replacement lift: 2pers. Gondola lift (monocable circulating ropeway)

planned: Jennerbahn II (YOC 2018)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1362 m · Carrying capacity/hour: 1600
Manufacturer: Leitner
Replacement lift: 2pers. Gondola lift (monocable circulating ropeway)

planned: Jennerwiesen (YOC 2018)

6pers. High speed chairlift (detachable) with bubble
Length: 604 m · Carrying capacity/hour: 2300
Manufacturer: Leitner
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Mitterkaser (YOC 2018)

6pers. High speed chairlift (detachable) with bubble
Length: 714 m · Carrying capacity/hour: 1400
Manufacturer: Leitner
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

planned: Osthangbahn (YOC 2018)

4pers. High speed chairlift (detachable) with bubble
Length: 1500 m · Carrying capacity/hour: 2000
Replacement lift: T-bar
T-bar
All lifts

planned: Fröttmaninger Berg (YOC 2018)

4pers. Chairlift (fixed-grip)
Length: 250 m · Carrying capacity/hour: 1500
All lifts
1-4 out of 4 ski resorts