Change lift info:

Tyrol (Tirol): planned lifts

All planned lifts in Tyrol (Tirol) - Lift projects at ski resorts in Tyrol (Tirol) (renewal, development and integration)


Overview: planned ski lifts in Tyrol (Tirol)

Total: 38
1
26
3
8

Add lifts and cable cars? Please report here


See also:
New lifts 2017/2018



Map: planned ski lifts in Tyrol (Tirol)

Show map
Tyrol (Tirol) – limit to

Tyrol (Tirol) – switch to

Tyrol (Tirol): planned ski lifts

1-24 out of 24 ski resorts

planned: Weißseespitze

100pers. Funifor - wind stable ropeway with wide rope gauge


planned: Melagbahn (Langtaufers) (YOC 2018)

8pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2000
All lifts

planned: zellamseeXpress I (Viehhofen-Winkelstation) (YOC 2018)

10pers. Gondola lift (monocable circulating ropeway)
Length: 533 m · Carrying capacity/hour: 2200
Ski resort: Saalbach Hinterglemm Leogang Fieberbrunn (Skicircus) [Saalbach Hinterglemm]

planned: Kohlmaisbahn (YOC 2018)

10pers. Gondola lift (monocable circulating ropeway)
Length: 2360 m · Carrying capacity/hour: 2400
Ski resort: Saalbach Hinterglemm Leogang Fieberbrunn (Skicircus) [Saalbach Hinterglemm]
Replacement lift: 10pers. Pulsed-movement aerial ropeway (gondola)

planned: Zwölferkogelbahn 1

10pers. Gondola lift (monocable circulating ropeway)
Length: 1585 m · Carrying capacity/hour: 3400
Ski resort: Saalbach Hinterglemm Leogang Fieberbrunn (Skicircus) [Saalbach Hinterglemm]
Replacement lift: 8pers. Gondola lift (monocable circulating ropeway)

planned: Zwölferkogelbahn 2

10pers. Gondola lift (monocable circulating ropeway)
Length: 1077 m · Carrying capacity/hour: 3400
Ski resort: Saalbach Hinterglemm Leogang Fieberbrunn (Skicircus) [Saalbach Hinterglemm]
Replacement lift: 8pers. Gondola lift (monocable circulating ropeway)
All lifts

planned: Gratlbahn

6pers. High speed chairlift (detachable) with bubble
Length: 1080 m · Carrying capacity/hour: 2400
All lifts

planned: Fernerkogl I

28pers. Tricable ropeway


planned: Fernerkogl II

10pers. Gondola lift (monocable circulating ropeway)


planned: Fernerkogl III

10pers. Gondola lift (monocable circulating ropeway)


planned: Grabkogl Ost

10pers. Gondola lift (monocable circulating ropeway)


planned: Grabkogl West

10pers. Gondola lift (monocable circulating ropeway)

All lifts

planned: Fleidingbahn

6pers. High speed chairlift (detachable) with bubble
Length: 1100 m · Carrying capacity/hour: 2400
Ski resort: SkiWelt Wilder Kaiser-Brixental [Westendorf]
Replacement lift: 3pers. Chairlift (fixed-grip)
All lifts

planned: Weißes Tal (YOC 2018)

6pers. High speed chairlift (detachable) with bubble
Length: 1250 m · Carrying capacity/hour: 2400
Replacement lift: T-bar
All lifts

planned: Hochzillertal <> Spieljoch (YOC 2019)

28pers. Tricable ropeway
Length: 3200 m · Carrying capacity/hour: 1800
Ski resort: Kaltenbach – Hochzillertal/​Hochfügen (SKi-optimal) [Hochzillertal]

planned: Wimbachexpress (YOC 2018)

10pers. Gondola lift (monocable circulating ropeway)
Length: 2000 m · Carrying capacity/hour: 3000
Manufacturer: Leitner
Ski resort: Kaltenbach – Hochzillertal/​Hochfügen (SKi-optimal) [Hochzillertal]
Replacement lift: 4pers. High speed chairlift (detachable)
All lifts

planned: Eichenhofbahn I+II+II (YOC 2017)

10pers. Gondola lift (monocable circulating ropeway)
Length: 3800 m · Carrying capacity/hour: 2400
Manufacturer: Leitner
Replacement lift: T-bar
T-bar
All lifts

planned: Fleckalmbahn (YOC 2018)

10pers. Gondola lift (monocable circulating ropeway)
Length: 4039 m · Carrying capacity/hour: 3000
Ski resort: Kitzbühel
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)
All lifts

planned: Malfon I & II (Verbindungsbahn St. Anton-Kappl) (YOC 2019)

8pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
Ski resort: St. Anton/St. Christoph/Stuben/Lech/Zürs/Warth/Schröcken – Ski Arlberg [St. Anton am Arlberg]

planned: Dorfbahn Warth

8pers. Gondola lift (monocable circulating ropeway)
Length: 470 m · Carrying capacity/hour: 800
Manufacturer: Doppelmayr
Ski resort: St. Anton/St. Christoph/Stuben/Lech/Zürs/Warth/Schröcken – Ski Arlberg [Warth]

planned: Schlosskopfbahn

8pers. Gondola lift (monocable circulating ropeway)
Length: 1414 m · Carrying capacity/hour: 2400
Ski resort: St. Anton/St. Christoph/Stuben/Lech/Zürs/Warth/Schröcken – Ski Arlberg [Lech]
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Zugerbergbahn

8pers. Gondola lift (monocable circulating ropeway)
Length: 1460 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: St. Anton/St. Christoph/Stuben/Lech/Zürs/Warth/Schröcken – Ski Arlberg [Lech]
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Rossfall (YOC 2019)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
Ski resort: St. Anton/St. Christoph/Stuben/Lech/Zürs/Warth/Schröcken – Ski Arlberg [St. Anton am Arlberg]

planned: Albonabahn I

6pers. High speed chairlift (detachable) with bubble
Length: 1354 m · Carrying capacity/hour: 2400
Ski resort: St. Anton/St. Christoph/Stuben/Lech/Zürs/Warth/Schröcken – Ski Arlberg [Stuben]
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

planned: Finkenberger Almbahn 1 (YOC 2017)

10pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 1780 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Mayrhofen – Penken/​Ahorn/​Rastkogel/​Eggalm [Finkenberg – Penken]
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)
All lifts

planned: Hoher Turm (YOC 2017)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1805 m · Carrying capacity/hour: 2400
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

planned: Goldwasserexpress (YOC 2017)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 950 m · Carrying capacity/hour: 2400
Replacement lift: T-bar
T-bar
All lifts

planned: Glungezerbahn I (YOC 2017)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1796 m · Carrying capacity/hour: 2000
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

planned: Hochzillertal <> Spieljoch (YOC 2019)

28pers. Tricable ropeway
Length: 3200 m · Carrying capacity/hour: 1800

planned: Onkeljochbahn (YOC 2018)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1720 m · Carrying capacity/hour: 2400
Manufacturer: Leitner
Replacement lift: 3pers. Chairlift (fixed-grip)
All lifts

planned: Gamskar-Bahn

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 2030 m · Carrying capacity/hour: 2000
Replacement lift: T-bar
All lifts

planned: Komperdellbahn (YOC 2020)

10pers. Gondola lift (monocable circulating ropeway)
Length: 2570 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Ski resort: Serfaus-Fiss-Ladis [Serfaus]
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)
All lifts

planned: Kirchenkarbahn II (YOC 2018)

10pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 1000 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
All lifts

planned: Diasbahn

10pers. Gondola lift (monocable circulating ropeway)
Length: 1500 m · Carrying capacity/hour: 2400
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)

planned: Malfon I & II (Verbindungsbahn St. Anton-Kappl) (YOC 2019)

8pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 1800
Manufacturer: Doppelmayr

planned: Rossfall (YOC 2019)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
All lifts

planned: Reith-Gschwandtkopf

4pers. High speed chairlift (detachable)
Length: 1170 m · Carrying capacity/hour: 2400
Replacement lift: 1pers. Chairlift (fixed-grip)
All lifts

planned: Panoramabahn Patscherkofel 1+2 (YOC 2017)

10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 50pers. Aerial tramway/Reversible ropeway
4pers. High speed chairlift (detachable) with bubble
All lifts

planned: Stiglreith-Sulzstich (YOC 2017)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1500 m · Carrying capacity/hour: 1515
Replacement lift: T-bar
All lifts

planned: Elferhüttenbahn (YOC 2017)

4pers. High speed chairlift (detachable) with bubble
Length: 630 m · Carrying capacity/hour: 2000
Replacement lift: T-bar
All lifts

planned: Bränd

4pers. High speed chairlift (detachable)
Length: 1543 m · Carrying capacity/hour: 2000
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts
1-24 out of 24 ski resorts