Change lift info:

Trentino: planned lifts

All planned lifts in Trentino - Lift projects at ski resorts in Trentino (renewal, development and integration)


Overview: planned ski lifts in Trentino

Total: 7
1
2
4

Add lifts and cable cars? Please report here


See also:
New lifts 2017/2018



Map: planned ski lifts in Trentino

Show map
Trentino – limit to

Trentino – switch to

Trentino: planned ski lifts

1-5 out of 5 ski resorts

planned: Franzin (YOC 2018)

6pers. High speed chairlift (detachable) with bubble
Length: 900 m · Carrying capacity/hour: 2000
Replacement lift: J-bar
J-bar

planned: Moseralm

6pers. High speed chairlift (detachable)
Length: 800 m · Carrying capacity/hour: 2400
All lifts

planned: Bassetta-Monte Spolverino (YOC 2018)

6pers. High speed chairlift (detachable) with bubble
Length: 710 m · Carrying capacity/hour: 2400
Ski resort: Madonna di Campiglio/Pinzolo/Folgàrida/Marilleva [Folgàrida/Marilleva]
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

planned: Folgaria-Francollini-Sommo Alto

8pers. Gondola lift (monocable circulating ropeway)
Length: 2500 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

planned: Fondo Piccolo-Sommo Alto

4pers. High speed chairlift (detachable)
Length: 1200 m · Carrying capacity/hour: 2200
Manufacturer: Leitner
All lifts

planned: Moena-Valbona (YOC 2017)

8pers. Gondola lift (monocable circulating ropeway)
Length: 3000 m · Carrying capacity/hour: 2400
All lifts
1-5 out of 5 ski resorts