Tiroler Zugspitz Arena: planned lifts

All planned lifts in the Tiroler Zugspitz Arena - Lift projects at ski resorts in the Tiroler Zugspitz Arena (renewal, development and integration)


Overview: planned ski lifts in the Tiroler Zugspitz Arena

Total: 2
1
1

Add lifts and cable cars? Please report here


See also:
New lifts 2017/2018



Map: planned ski lifts in the Tiroler Zugspitz Arena

Show map
Tiroler Zugspitz Arena – switch to

Tiroler Zugspitz Arena: planned ski lifts

1-2 out of 2 ski resorts

planned: Weißes Tal (YOC 2018)

6pers. High speed chairlift (detachable) with bubble
Length: 1250 m · Carrying capacity/hour: 2400
Replacement lift: T-bar
All lifts

planned: Gamskar-Bahn

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 2030 m · Carrying capacity/hour: 2000
Replacement lift: T-bar
All lifts