Ski resorts Switzerland
Change lift info:
Switzerland: planned lifts
All planned lifts in Switzerland (Schweiz)
Overview: planned ski lifts in Switzerland (Schweiz)
Lift projects at ski resorts in Switzerland (Schweiz) (renewal, development and integration)
Total: 64
1 8 25 2 25 3
Add lifts and cable cars? Please report here
See also:
New lifts 2023/2024
Switzerland: planned ski lifts
- Switzerland – limit to
Greater Regions: Eastern Switzerland (27), Lemanic Region (26), Espace Mittelland (7), Central Switzerland (5)
Cantons: Graubünden (26), Valais (Wallis) (25), Bern (7), Schwyz (3), Waadt (1), Uri (1), Appenzell Ausserrhoden (1), Lucerne (1), Obwalden (1)
Mountain ranges: Swiss Alps (63)
Language areas: German-speaking Switzerland (Deutschschweiz) (47), Romandy (Romandie) (14), Italian-speaking Switzerland (Svizzera italiana) (3)
1-34 out of 34 ski resorts
planned: Samnaun Dorf-Salaaser Kopf
28pers. Tricable ropewayCarrying capacity/hour: 1800
Manufacturer: Doppelmayr
Details
planned: Laret-Chams-Muller (YOC 2024)
10pers. Gondola lift (monocable circulating ropeway)Length: 3183 m · Carrying capacity/hour: 2000
Manufacturer: Garaventa
Details
planned: Stockhorn
8pers. Gondola lift (monocable circulating ropeway)Carrying capacity/hour: 2000
Details
planned: Gifthittli
8pers. High speed chairlift (detachable) with bubble and seat heatingLength: 1828 m · Carrying capacity/hour: 3200
Details
planned: Furgg-Garten
6pers. High speed chairlift (detachable) with bubbleLength: 1500 m · Carrying capacity/hour: 2400
Details
planned: FlemXpress (Startgels-Segnes) (YOC 2024)
10pers. Gondola lift (monocable circulating ropeway)Length: 1630 m · Carrying capacity/hour: 1600
Manufacturer: Bartholet BMF
Details
planned: FlemXpress (Segnes-Nagens Sura) (YOC 2024)
10pers. Gondola lift (monocable circulating ropeway)Length: 600 m · Carrying capacity/hour: 1500
Manufacturer: Bartholet BMF
Details
planned: Esserts–Planards–Savoleyres (YOC 2024)
Combined installation (6 pers. chair and 10 pers. gondola) with seat heatingLength: 2100 m · Carrying capacity/hour: 2100
Details
planned: Prarion-Tracouet (YOC 2024)
Combined installation (6 pers. chair and 10 pers. gondola)Length: 1444 m · Carrying capacity/hour: 2400
Manufacturer: Garaventa
Details
planned: Trabanta (YOC 2028)
6pers. High speed chairlift (detachable) with bubbleLength: 1483 m · Carrying capacity/hour: 2800
Details
planned: Greppon Blanc (YOC 2026)
6pers. High speed chairlift (detachable) with bubbleManufacturer: Bartholet BMF
Details
planned: Hannigbahn (YOC 2024)
10pers. Gondola lift (monocable circulating ropeway)Length: 1120 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
Details
planned: P2-Kalbermatten
10pers. Gondola lift (monocable circulating ropeway)Length: 400 m · Carrying capacity/hour: 2000
Manufacturer: Garaventa
Details
planned: Birg-Schilthorn (Piz Gloria) (YOC 2025)
100pers. Funifor - wind stable ropeway with wide rope gaugeLength: 1751 m · Carrying capacity/hour: 800
Manufacturer: Garaventa
Details
1-34 out of 34 ski resorts