Change lift info:

South Tyrol (Südtirol): planned lifts

All planned lifts in South Tyrol (Südtirol) - Lift projects at ski resorts in South Tyrol (Südtirol) (renewal, development and integration)


Overview: planned ski lifts in South Tyrol (Südtirol)

Total: 4
4

Add lifts and cable cars? Please report here


See also:
New lifts 2017/2018



Map: planned ski lifts in South Tyrol (Südtirol)

Show map
South Tyrol (Südtirol) – limit to

South Tyrol (Südtirol) – switch to

South Tyrol (Südtirol): planned ski lifts

1-2 out of 2 ski resorts

planned: Franzin (YOC 2018)

6pers. High speed chairlift (detachable) with bubble
Length: 900 m · Carrying capacity/hour: 2000
Replacement lift: J-bar
J-bar

planned: Moseralm

6pers. High speed chairlift (detachable)
Length: 800 m · Carrying capacity/hour: 2400
All lifts

planned: Valgrande-Popera (YOC 2018)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
Ski resort: Three Peaks Dolomites – Helm/Stiergarten/Rotwand/Kreuzbergpass [Kreuzbergpass]

planned: Valgrande-Col d’la Tenda (YOC 2018)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
Ski resort: Three Peaks Dolomites – Helm/Stiergarten/Rotwand/Kreuzbergpass [Kreuzbergpass]
All lifts
1-2 out of 2 ski resorts