Change lift info:

Northern French Alps (Alpes du Nord): planned lifts

All planned lifts in the Northern French Alps (Alpes du Nord) - Lift projects at ski resorts in the Northern French Alps (Alpes du Nord) (renewal, development and integration)


Overview: planned ski lifts in the Northern French Alps (Alpes du Nord)

Total: 11
1
10

Add lifts and cable cars? Please report here


See also:
New lifts 2016/2017



Map: planned ski lifts in the Northern French Alps (Alpes du Nord)

Show map
Northern French Alps (Alpes du Nord) – switch to

Northern French Alps (Alpes du Nord): planned ski lifts

1-8 out of 8 ski resorts

planned: Bellecôte (Glacier) (YOC 2017)

10pers. Gondola lift (monocable circulating ropeway)
Length: 2920 m · Carrying capacity/hour: 2400
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)

planned: Crozats (YOC 2017)

6pers. High speed chairlift (detachable)
Length: 1075 m · Carrying capacity/hour: 3000
Replacement lift: 4pers. Chairlift (fixed-grip)
All lifts

planned: Morgins-La Foilleuse

6pers. High speed chairlift (detachable)
Length: 1404 m · Carrying capacity/hour: 2400
Ski resort: Les Portes du Soleil – Morzine/​Avoriaz/​Les Gets/​Châtel/​Morgins/​Champéry [Morgins]
Replacement lift: 3pers. High speed chairlift (detachable)
All lifts

planned: Corbier (YOC 2019)

6pers. High speed chairlift (detachable)

Ski resort: Les Sybelles [Le Corbier]
Replacement lift: 4pers. Chairlift (fixed-grip)

planned: Vadrouilles (YOC 2019)

4pers. Chairlift (fixed-grip)

Ski resort: Les Sybelles [Le Corbier]
All lifts

planned: Mottet (YOC 2017)

6pers. High speed chairlift (detachable)
Length: 1773 m · Carrying capacity/hour: 2800
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Biollène (YOC 2017)

6pers. High speed chairlift (detachable)
Length: 1445 m · Carrying capacity/hour: 2800
Replacement lift: 4pers. Chairlift (fixed-grip)
All lifts

planned: TSD du Crêt du Merle (YOC 2017)

6pers. High speed chairlift (detachable)
Length: 1480 m · Carrying capacity/hour: 2800
Manufacturer: Poma
Replacement lift: 3pers. High speed chairlift (detachable)
All lifts

planned: Albiez-Karellis 1

4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000

planned: Albiez-Karellis 2

4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000
All lifts

planned: Albiez-Karellis 1

4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000

planned: Albiez-Karellis 2

4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000
All lifts
1-8 out of 8 ski resorts