Change lift info:

Montana: planned lifts

All planned lifts in Montana - Lift projects at ski resorts in Montana (renewal, development and integration)


Overview: planned ski lifts in Montana

Total: 13
1
11
1

Add lifts and cable cars? Please report here


See also:
New lifts 2016/2017



Montana - expand to (number of planned ski lifts):

Map: planned ski lifts in Montana

Show map
Montana - limit to (number of planned ski lifts):

Montana: planned ski lifts

1-2 out of 2 ski resorts

planned: North Village Gondola (YOC 2019)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2600 m · Carrying capacity/hour: 2400

planned: Thunderwolf (YOC 2022)

6pers. High speed chairlift (detachable) with bubble
Length: 1820 m · Carrying capacity/hour: 2400

planned: Swift Current Express (YOC 2021)

6pers. High speed chairlift (detachable) with bubble
Length: 2607 m · Carrying capacity/hour: 2600
Replacement lift: 4pers. High speed chairlift (detachable)

planned: Ramcharger (YOC 2018)

6pers. High speed chairlift (detachable) with bubble
Length: 1395 m · Carrying capacity/hour: 2400
Replacement lift: 4pers. High speed chairlift (detachable)

planned: Moonlight Expansion (YOC 2024)

4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000

planned: Headwaters (YOC 2023)

4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Moonlight Lodge (YOC 2023)

4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000

planned: Shedhorn (YOC 2018)

4pers. High speed chairlift (detachable)
Length: 1410 m · Carrying capacity/hour: 2000
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: South Face (YOC 2021)

4pers. Chairlift (fixed-grip)
Carrying capacity/hour: 2000
All lifts

planned: TV Mountain Express (YOC 2017)

4pers. High speed chairlift (detachable)


planned: Chairlift C (YOC 2016)

4pers. Chairlift (fixed-grip)


planned: High Roller Chair (YOC 2016)

2pers. Chairlift (fixed-grip)
Length: 1569 m · Carrying capacity/hour: 850

planned: La Valle T-Bar (YOC 2016)

T-bar
Length: 305 m · Carrying capacity/hour: 500
All lifts
1-2 out of 2 ski resorts