Change lift info:

Nationalpark Region Hohe Tauern: planned lifts

All planned lifts in the Nationalpark Region Hohe Tauern - Lift projects at ski resorts in the Nationalpark Region Hohe Tauern (renewal, development and integration)


Overview: planned ski lifts in the Nationalpark Region Hohe Tauern

Total: 15
9
5
1

Add lifts and cable cars? Please report here


See also:
New lifts 2016/2017



Map: planned ski lifts in the Nationalpark Region Hohe Tauern

Show map
Nationalpark Region Hohe Tauern – switch to

Nationalpark Region Hohe Tauern: planned ski lifts

1-8 out of 8 ski resorts

planned: Ganzeralpe (YOC 2017)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1450 m · Carrying capacity/hour: 2800
All lifts

planned: Schlossalmbahn (YOC 2018)

10pers. Gondola lift (monocable circulating ropeway)
Length: 3422 m · Carrying capacity/hour: 3000
Ski resort: Bad Gastein/Bad Hofgastein – Schlossalm/Angertal/Stubnerkogel [Bad Hofgastein]
Replacement lift: 120pers. Funicular

planned: Sendleitenbahn (YOC 2019)

8pers. High speed chairlift (detachable) with bubble
Length: 1240 m · Carrying capacity/hour: 4000
Ski resort: Bad Gastein/Bad Hofgastein – Schlossalm/Angertal/Stubnerkogel [Bad Hofgastein]
Replacement lift: 4pers. High speed chairlift (detachable) with bubble
All lifts

planned: Fleckalmbahn (YOC 2017)

10pers. Gondola lift (monocable circulating ropeway)
Length: 4039 m · Carrying capacity/hour: 3000
Ski resort: Kitzbühel
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)
All lifts

planned: Waldalmbahn 1

10pers. Gondola lift (monocable circulating ropeway)
Length: 1000 m · Carrying capacity/hour: 1400
Manufacturer: Doppelmayr
All lifts

planned: Ankogel Express

6pers. High speed chairlift (detachable)
Length: 2100 m · Carrying capacity/hour: 2400

planned: Köfele III

T-bar
Length: 500 m · Carrying capacity/hour: 1020
All lifts

planned: Mayerhofbahn I

10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
Ski resort: Großarl/Dorfgastein [Dorfgastein]
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Mühlwinkel II

10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
Ski resort: Großarl/Dorfgastein [Dorfgastein]

planned: Hochbrand-Kieserl II

8pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
Ski resort: Großarl/Dorfgastein [Großarl]

planned: Bergland

6pers. High speed chairlift (detachable)
Carrying capacity/hour: 2400
Ski resort: Großarl/Dorfgastein [Großarl]
All lifts

planned: Kaprun Süd (YOC 2017)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1500 m · Carrying capacity/hour: 2000
Replacement lift: 27pers. Aerial tramway/Reversible ropeway

planned: Schneegrabenbahn 1+2

8pers. Gondola lift (monocable circulating ropeway)


planned: Sportcarver

6pers. High speed chairlift (detachable) with bubble

All lifts
1-8 out of 8 ski resorts