Italy: planned lifts

All planned lifts in Italy (Italia) - Lift projects at ski resorts in Italy (Italia) (renewal, development and integration)


Overview: planned ski lifts in Italy (Italia)

Total: 25
1
3
5
15
1

Add lifts and cable cars? Please report here


See also:
New lifts 2016/2017



Map: planned ski lifts in Italy (Italia)

Show map
Italy – limit to

Italy: planned ski lifts

1-15 out of 15 ski resorts

planned: Valgrande-Popera (YOC 2018)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
Ski resort: Helm/Stiergarten/Rotwand/Kreuzbergpass (Three Peaks Dolomites) [Kreuzbergpass]

planned: Valgrande-Col d’la Tenda (YOC 2018)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
Ski resort: Helm/Stiergarten/Rotwand/Kreuzbergpass (Three Peaks Dolomites) [Kreuzbergpass]
All lifts

planned: Franzin (YOC 2017)

6pers. High speed chairlift (detachable) with bubble
Length: 900 m · Carrying capacity/hour: 2000
Replacement lift: J-bar
J-bar

planned: Moseralm

6pers. High speed chairlift (detachable)
Length: 800 m · Carrying capacity/hour: 2400
All lifts

planned: Zermatt-Furi (YOC 2018)

100pers. Aerial tramway/Reversible ropeway
Length: 1715 m · Carrying capacity/hour: 1000
Manufacturer: Garaventa
Ski resort: Zermatt/Breuil-Cervinia/Valtournenche – Matterhorn [Zermatt]
Replacement lift: 85pers. Aerial tramway/Reversible ropeway

planned: Testa Grigia - Matterhorn glacier paradise (YOC 2018)

100pers. Aerial tramway/Reversible ropeway
Length: 1500 m · Carrying capacity/hour: 1000
Manufacturer: Garaventa
Ski resort: Zermatt/Breuil-Cervinia/Valtournenche – Matterhorn [Zermatt]

planned: Trockener Steg–Matterhorn glacier paradise (YOC 2018)

28pers. Tricable ropeway
Length: 3800 m · Carrying capacity/hour: 2000
Manufacturer: Leitner
Ski resort: Zermatt/Breuil-Cervinia/Valtournenche – Matterhorn [Zermatt]

planned: Furgg-Garten

6pers. High speed chairlift (detachable) with bubble
Length: 1500 m · Carrying capacity/hour: 2400
Ski resort: Zermatt/Breuil-Cervinia/Valtournenche – Matterhorn [Zermatt]

planned: Breitboden-Rosenritz

4pers. High speed chairlift (detachable)
Length: 2000 m · Carrying capacity/hour: 2400
Ski resort: Zermatt/Breuil-Cervinia/Valtournenche – Matterhorn [Zermatt]
All lifts

planned: Vallaccia (YOC 2017)

6pers. High speed chairlift (detachable) with bubble
Length: 1600 m · Carrying capacity/hour: 2000
All lifts

planned: Bassetta-Monte Spolverino (YOC 2017)

6pers. High speed chairlift (detachable) with bubble
Length: 710 m · Carrying capacity/hour: 2400
Ski resort: Madonna di Campiglio/Pinzolo/Folgàrida/Marilleva [Folgàrida/Marilleva]
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

planned: Folgaria-Francollini-Sommo Alto

8pers. Gondola lift (monocable circulating ropeway)
Length: 2500 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

planned: Fondo Piccolo-Sommo Alto

4pers. High speed chairlift (detachable)
Length: 1200 m · Carrying capacity/hour: 2200
Manufacturer: Leitner
All lifts

planned: Lazaun (YOC 2017)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1300 m · Carrying capacity/hour: 2400
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

planned: San Domenico–Alpe Ciamporino (YOC 2017)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1440 m · Carrying capacity/hour: 2400
Manufacturer: Bartholet BMF
Replacement lift: 2pers. Chairlift (fixed-grip)
2pers. Chairlift (fixed-grip)
All lifts

planned: Campo Felice-Quota (YOC 2016)

4pers. Chairlift (fixed-grip)

Manufacturer: Leitner
All lifts

planned: Valgrande-Popera (YOC 2018)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400

planned: Valgrande-Col d’la Tenda (YOC 2018)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
All lifts

planned: Foppolo-Montebello (YOC 2017)

12pers. Gondola lift (monocable circulating ropeway)
Length: 1933 m · Carrying capacity/hour: 2400
Manufacturer: Leitner
Replacement lift: 4pers. Chairlift (fixed-grip)
4pers. Chairlift (fixed-grip)

planned: Cornellini (YOC 2017)

4pers. Chairlift (fixed-grip)
Length: 1000 m · Carrying capacity/hour: 2000
All lifts

planned: Scavalco

100pers. Funifor - wind stable ropeway with wide rope gauge
Length: 2000 m ·

planned: Cardita Nord

2pers. Chairlift (fixed-grip)


planned: Cardita Est

2pers. Chairlift (fixed-grip)


planned: Terminiletto

2pers. Chairlift (fixed-grip)

All lifts

planned: Della Faggeta (YOC 2016)

J-bar
Carrying capacity/hour: 720
Manufacturer: Leitner
All lifts

planned: Artavaggio-Rifugio Nicola

4pers. Chairlift (fixed-grip)
Length: 1500 m ·
All lifts
1-15 out of 15 ski resorts