Change lift info:

Innsbruck: planned lifts

All planned lifts in the Region of Innsbruck - Lift projects at ski resorts in the Region of Innsbruck (renewal, development and integration)


Overview: planned ski lifts in the Region of Innsbruck

Total: 5
1
2
2

Add lifts and cable cars? Please report here


See also:
New lifts 2017/2018



Map: planned ski lifts in the Region of Innsbruck

Show map
Innsbruck – limit to

Innsbruck – switch to

Innsbruck: planned ski lifts

1-4 out of 4 ski resorts

planned: Glungezerbahn I (YOC 2018)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1796 m · Carrying capacity/hour: 2000
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Glungezerbahn II (YOC 2018)

10pers. Gondola lift (monocable circulating ropeway)
Length: 2156 m · Carrying capacity/hour: 2000
Replacement lift: T-bar
All lifts

planned: Seefelder Jochbahn (YOC 2018)

25pers. Aerial tramway/Reversible ropeway
Length: 849 m · Carrying capacity/hour: 400
Replacement lift: 20pers. Aerial tramway/Reversible ropeway
All lifts

planned: Reith-Gschwandtkopf

4pers. High speed chairlift (detachable)
Length: 1170 m · Carrying capacity/hour: 2400
Replacement lift: 1pers. Chairlift (fixed-grip)
All lifts

planned: Elferhüttenbahn (YOC 2018)

4pers. High speed chairlift (detachable) with bubble
Length: 630 m · Carrying capacity/hour: 2000
Replacement lift: T-bar
All lifts
1-4 out of 4 ski resorts