Change lift info:

Innsbruck: planned lifts

All planned lifts in the Region of Innsbruck - Lift projects at ski resorts in the Region of Innsbruck (renewal, development and integration)


Overview: planned ski lifts in the Region of Innsbruck

Total: 6
3
1
2

Add lifts and cable cars? Please report here


See also:
New lifts 2017/2018



Map: planned ski lifts in the Region of Innsbruck

Show map
Innsbruck – limit to

Innsbruck – switch to

Innsbruck: planned ski lifts

1-6 out of 6 ski resorts

planned: Hoher Turm (YOC 2017)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1805 m · Carrying capacity/hour: 2400
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

planned: Glungezerbahn I (YOC 2017)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1796 m · Carrying capacity/hour: 2000
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

planned: Reith-Gschwandtkopf

4pers. High speed chairlift (detachable)
Length: 1170 m · Carrying capacity/hour: 2400
Replacement lift: 1pers. Chairlift (fixed-grip)
All lifts

planned: Stiglreith-Sulzstich (YOC 2017)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1500 m · Carrying capacity/hour: 1515
Replacement lift: T-bar
All lifts

planned: Panoramabahn Patscherkofel 1+2 (YOC 2017)

10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 50pers. Aerial tramway/Reversible ropeway
4pers. High speed chairlift (detachable) with bubble
All lifts

planned: Elferhüttenbahn (YOC 2017)

4pers. High speed chairlift (detachable) with bubble
Length: 630 m · Carrying capacity/hour: 2000
Replacement lift: T-bar
All lifts
1-6 out of 6 ski resorts