Change lift info:

France: planned lifts

All planned lifts in France - Lift projects at ski resorts in France (renewal, development and integration)


Overview: planned ski lifts in France

Total: 13
1
12

Add lifts and cable cars? Please report here


See also:
New lifts 2016/2017



Map: planned ski lifts in France

Show map
France – limit to

France: planned ski lifts

1-10 out of 10 ski resorts

planned: Bellecôte (Glacier) (YOC 2017)

10pers. Gondola lift (monocable circulating ropeway)
Length: 2920 m · Carrying capacity/hour: 2400
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)

planned: Crozats (YOC 2017)

6pers. High speed chairlift (detachable)
Length: 1075 m · Carrying capacity/hour: 3000
Replacement lift: 4pers. Chairlift (fixed-grip)
All lifts

planned: Morgins-La Foilleuse

6pers. High speed chairlift (detachable)
Length: 1404 m · Carrying capacity/hour: 2400
Ski resort: Les Portes du Soleil – Morzine/​Avoriaz/​Les Gets/​Châtel/​Morgins/​Champéry [Morgins]
Replacement lift: 3pers. High speed chairlift (detachable)
All lifts

planned: Corbier (YOC 2019)

6pers. High speed chairlift (detachable)

Ski resort: Les Sybelles [Le Corbier]
Replacement lift: 4pers. Chairlift (fixed-grip)

planned: Vadrouilles (YOC 2019)

4pers. Chairlift (fixed-grip)

Ski resort: Les Sybelles [Le Corbier]
All lifts

planned: Mottet (YOC 2017)

6pers. High speed chairlift (detachable)
Length: 1773 m · Carrying capacity/hour: 2800
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Biollène (YOC 2017)

6pers. High speed chairlift (detachable)
Length: 1445 m · Carrying capacity/hour: 2800
Replacement lift: 4pers. Chairlift (fixed-grip)
All lifts

planned: Homme de Pierre (YOC 2020)

6pers. High speed chairlift (detachable)
Length: 2000 m · Carrying capacity/hour: 2400
Replacement lift: 3pers. Chairlift (fixed-grip)
J-bar
All lifts

planned: TSD du Crêt du Merle (YOC 2017)

6pers. High speed chairlift (detachable)
Length: 1480 m · Carrying capacity/hour: 2800
Manufacturer: Poma
Replacement lift: 3pers. High speed chairlift (detachable)
All lifts

planned: Albiez-Karellis 1

4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000

planned: Albiez-Karellis 2

4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000
All lifts

planned: Cotch (YOC 2017)

6pers. High speed chairlift (detachable)
Carrying capacity/hour: 3000
All lifts

planned: Albiez-Karellis 1

4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000

planned: Albiez-Karellis 2

4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000
All lifts
1-10 out of 10 ski resorts