planned: Plaun Rudien-La Siala (YOC 2012)
6pers. High speed chairlift (detachable) with bubble
Length: 2226 m · Carrying capacity/hour: 2400
Replacement lift: 3pers. High speed chairlift (detachable)
planned: Alp Sogn Martin-Plaun Rudien (YOC 2012)
6pers. High speed chairlift (detachable) with bubble
Length: 2100 m · Carrying capacity/hour: 2400
planned: Plaun Lavadinas-Fuorcla da Sagogn (Alp Ruschein) (YOC 2012)
6pers. High speed chairlift (detachable) with bubble
Length: 2400 m · Carrying capacity/hour: 2400
Replacement lift: 2pers. Chairlift (fixed-grip)
planned: Treis Palas-Crap Masegn (YOC 2012)
6pers. High speed chairlift (detachable)
Length: 1200 m · Carrying capacity/hour: 2400
planned: Midada Sut-Prau Grass (YOC 2012)
J-bar
Length: 500 m · Carrying capacity/hour: 720