Change lift info:

Bernese Oberland: planned lifts

All planned lifts in the Bernese Oberland - Lift projects at ski resorts in the Bernese Oberland (renewal, development and integration)


Overview: planned ski lifts in the Bernese Oberland

Total: 5
5

Add lifts and cable cars? Please report here


See also:
New lifts 2016/2017



Bernese Oberland - expand to (number of planned ski lifts):

Map: planned ski lifts in the Bernese Oberland

Show map
Bernese Oberland - limit to (number of planned ski lifts):

Bernese Oberland: planned ski lifts

1-3 out of 3 ski resorts

planned: Eiger-Express (Grund-Eigergletscher) (YOC 2017)

24pers. Tricable ropeway
Length: 6300 m · Carrying capacity/hour: 2400

planned: Grindelwald-Männlichen (YOC 2017)

8pers. Gondola lift (monocable circulating ropeway)
Length: 6000 m · Carrying capacity/hour: 1800
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)
All lifts

planned: Saanenwald-Saanerslochgrat (YOC 2017)

10pers. Gondola lift (monocable circulating ropeway)
Length: 2002 m · Carrying capacity/hour: 2400
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)

planned: Saanenmöser-Saanenwald (YOC 2017)

10pers. Gondola lift (monocable circulating ropeway)
Length: 841 m · Carrying capacity/hour: 2400
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)
All lifts

planned: Panoramabahn Gstaad-Eggli (YOC 2017)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1326 m · Carrying capacity/hour: 1200
Manufacturer: Bartholet BMF
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)
All lifts
1-3 out of 3 ski resorts