Change lift info:

Switzerland Switzerland: planned lifts

All planned lifts in Switzerland - Lift projects at ski resorts in Switzerland (renewal, development and integration)


Overview: planned ski lifts in Switzerland

Total: 44
1
3
17
1
20
2

Add lifts and cable cars? Please report here


See also:
New lifts 2016/2017



Switzerland - expand to (number of planned ski lifts):

Map: planned ski lifts in Switzerland

Show map
Switzerland - limit to (number of planned ski lifts):

Switzerland Switzerland: planned ski lifts

1-23 out of 23 ski resorts

planned: St. Moritz Bad–Signal (YOC 2017)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1460 m · Carrying capacity/hour: 2400
Replacement lift: 100pers. Aerial tramway/Reversible ropeway
All lifts

planned: Lauchernalp-Stafel (YOC 2017)

6pers. High speed chairlift (detachable)
Length: 610 m · Carrying capacity/hour: 1800
Replacement lift: 2pers. Chairlift (fixed-grip)
T-bar
All lifts

planned: Brüggerhorn (YOC 2016)

4pers. High speed chairlift (detachable) with bubble
Length: 1337 m · Carrying capacity/hour: 2000
Ski resort: Arosa Lenzerheide [Arosa]
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

planned: Esserts–Planards–Savoleyres (YOC 2016)

Combined installation (6 pers. chair and 10 pers. gondola) with seat heating
Length: 2100 m · Carrying capacity/hour: 2100
Ski resort: 4 Vallées – Verbier/​La Tzoumaz/​Nendaz/​Veysonnaz/​Thyon [Verbier]
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)
T-bar
All lifts

planned: Maschgenkamm (YOC 2016)

8pers. Gondola lift (monocable circulating ropeway)
Length: 3298 m · Carrying capacity/hour: 2400
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)
All lifts

planned: Val Lavèr

4pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400

planned: Champatsch

4pers. High speed chairlift (detachable) with bubble
Length: 1320 m · Carrying capacity/hour: 2400
Replacement lift: T-bar
T-bar
All lifts

planned: Zermatt-Furi (YOC 2018)

100pers. Aerial tramway/Reversible ropeway
Length: 1715 m · Carrying capacity/hour: 1000
Manufacturer: Garaventa
Ski resort: Zermatt/Breuil-Cervinia/Valtournenche – Matterhorn [Zermatt]
Replacement lift: 85pers. Aerial tramway/Reversible ropeway

planned: Testa Grigia - Matterhorn glacier paradise (YOC 2018)

100pers. Aerial tramway/Reversible ropeway
Length: 1500 m · Carrying capacity/hour: 1000
Manufacturer: Garaventa
Ski resort: Zermatt/Breuil-Cervinia/Valtournenche – Matterhorn [Zermatt]

planned: Trockener Steg–Matterhorn glacier paradise (YOC 2018)

28pers. Tricable ropeway
Length: 3800 m · Carrying capacity/hour: 2000
Manufacturer: Leitner
Ski resort: Zermatt/Breuil-Cervinia/Valtournenche – Matterhorn [Zermatt]

planned: Furgg-Garten

6pers. High speed chairlift (detachable) with bubble
Length: 1500 m · Carrying capacity/hour: 2400
Ski resort: Zermatt/Breuil-Cervinia/Valtournenche – Matterhorn [Zermatt]

planned: Breitboden-Rosenritz

4pers. High speed chairlift (detachable)
Length: 2000 m · Carrying capacity/hour: 2400
Ski resort: Zermatt/Breuil-Cervinia/Valtournenche – Matterhorn [Zermatt]
All lifts

planned: Startgels-Cassonsgrat (YOC 2019)

80pers. Aerial tramway/Reversible ropeway
Length: 2500 m · Carrying capacity/hour: 800
Replacement lift: 26pers. Aerial tramway/Reversible ropeway

planned: Flims-Foppa-Startgels (YOC 2019)

10pers. Gondola lift (monocable circulating ropeway)
Length: 3322 m · Carrying capacity/hour: 2400
Replacement lift: 3pers. High speed chairlift (detachable)
4pers. High speed chairlift (detachable)

planned: Midada Sut-Prau Grass

J-bar
Length: 500 m · Carrying capacity/hour: 720
All lifts

planned: Morgins-La Foilleuse

6pers. High speed chairlift (detachable)
Length: 1404 m · Carrying capacity/hour: 2400
Ski resort: Les Portes du Soleil – Morzine/​Avoriaz/​Les Gets/​Châtel/​Morgins/​Champéry [Morgins]
Replacement lift: 3pers. High speed chairlift (detachable)
All lifts

planned: Engstlenalp-Schafthal

4pers. High speed chairlift (detachable)


planned: Jochpass-Ober Grumm

4pers. High speed chairlift (detachable)

All lifts

planned: Eiger-Express (Grund-Eigergletscher) (YOC 2017)

24pers. Tricable ropeway
Length: 6300 m · Carrying capacity/hour: 2400

planned: Grindelwald-Männlichen (YOC 2017)

8pers. Gondola lift (monocable circulating ropeway)
Length: 6000 m · Carrying capacity/hour: 1800
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)
All lifts

planned: P2-Kalbermatten

10pers. Gondola lift (monocable circulating ropeway)
Length: 400 m · Carrying capacity/hour: 2000
Manufacturer: Bartholet BMF

planned: Spielboden-Längfluh

10pers. Gondola lift (monocable circulating ropeway)
Length: 940 m · Carrying capacity/hour: 2000
Manufacturer: Bartholet BMF

planned: Längfluh-Feechopf

10pers. Gondola lift (monocable circulating ropeway)
Length: 3000 m · Carrying capacity/hour: 2000
Manufacturer: Bartholet BMF
All lifts

planned: St-Moritz-Hahnensee (YOC 2017)

8pers. Gondola lift (monocable circulating ropeway)


planned: Curtinella (YOC 2016)

6pers. High speed chairlift (detachable) with bubble
Length: 2145 m · Carrying capacity/hour: 2400
Manufacturer: Bartholet BMF
Replacement lift: T-bar
All lifts

planned: Oberdorf-Freienalp (YOC 2017)

6pers. High speed chairlift (detachable) with bubble
Length: 1300 m · Carrying capacity/hour: 2000
Replacement lift: T-bar
T-bar
All lifts

planned: Montana-Arnouva (YOC 2016)

10pers. Gondola lift (monocable circulating ropeway)
Length: 554 m · Carrying capacity/hour: 1600
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)

planned: Aminona-Colombire-Grangettes (YOC 2017)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2000 m · Carrying capacity/hour: 2000
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)

planned: Arnouva-Cry d'Er (YOC 2016)

6pers. High speed chairlift (detachable) with bubble
Length: 1835 m · Carrying capacity/hour: 2400
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)
All lifts

planned: Oberalp–Schneehühnerstock (YOC 2017)

8pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400

planned: Oberalppass-Piz Calmut (YOC 2016)

6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 966 m · Carrying capacity/hour: 2400
Manufacturer: Bartholet BMF
Replacement lift: T-bar

planned: Vordere Felli–Schneehühnerstock (YOC 2017)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2000
All lifts

planned: Laouissalet-Meilleret (YOC 2016)

6pers. High speed chairlift (detachable)
Length: 1200 m · Carrying capacity/hour: 3000
Manufacturer: Poma
Replacement lift: T-bar

planned: Conche-Laouissalet (YOC 2016)

4pers. High speed chairlift (detachable)
Length: 1300 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)
T-bar
All lifts

planned: Panoramabahn Gstaad-Eggli (YOC 2017)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1326 m · Carrying capacity/hour: 1200
Manufacturer: Bartholet BMF
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)
All lifts

planned: Plattja (YOC 2017)

4pers. High speed chairlift (detachable)
Length: 1400 m · Carrying capacity/hour: 2000
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

planned: Standseilbahn Schwyz-Stoos (YOC 2017)

100pers. Funicular
Length: 1304 m · Carrying capacity/hour: 1500
Manufacturer: Garaventa
Replacement lift: 97pers. Funicular
All lifts

planned: Mattabahn (YOC 2016)

4pers. High speed chairlift (detachable)
Length: 504 m · Carrying capacity/hour: 1600
Manufacturer: Leitner
All lifts

planned: Nätschen–Gütsch (YOC 2016)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1500 m · Carrying capacity/hour: 2400
Replacement lift: 4pers. High speed chairlift (detachable)

planned: Andermatt–Nätschen (YOC 2016)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1300 m · Carrying capacity/hour: 2400
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Vordere Felli–Schneehühnerstock (YOC 2017)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2000

planned: Hinterbördli–Strahlgand (YOC 2016)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2000

planned: Unterstafel–Gütsch (YOC 2016)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2000
Replacement lift: T-bar

planned: Trainerlift Nätschen (YOC 2016)

T-bar
Carrying capacity/hour: 1000
All lifts

planned: Tschierv-Alp da Munt (YOC 2016)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1400 m · Carrying capacity/hour: 1200
All lifts
1-23 out of 23 ski resorts