Change lift info:

South Tyrol: planned lifts

All planned lifts in South Tyrol - Lift projects at ski resorts in South Tyrol (renewal, development and integration)


Overview: planned ski lifts in South Tyrol

Total: 6
1
1
4

Add lifts and cable cars? Please report here


See also:
New lifts 2016/2017



South Tyrol - expand to (number of planned ski lifts):

Map: planned ski lifts in South Tyrol

Show map
South Tyrol - limit to (number of planned ski lifts):

South Tyrol: planned ski lifts

1-4 out of 4 ski resorts

planned: Valgrande-Col d’la Tenda (YOC 2018)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
Ski resort: Helm/Stiergarten/Rotwand/Kreuzbergpass (Sesto Dolomites) [Kreuzbergpass]

planned: Valgrande-Popera (YOC 2018)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
Ski resort: Helm/Stiergarten/Rotwand/Kreuzbergpass (Sesto Dolomites) [Kreuzbergpass]
All lifts

planned: Franzin (YOC 2016)

6pers. High speed chairlift (detachable) with bubble
Length: 900 m · Carrying capacity/hour: 2000
Replacement lift: J-bar
J-bar

planned: Moseralm

6pers. High speed chairlift (detachable)
Length: 800 m · Carrying capacity/hour: 2400
All lifts

planned: Laner (YOC 2016)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 505 m · Carrying capacity/hour: 2800
Ski resort: Latemar – Obereggen/​Pampeago/​Predazzo [Obereggen]
Replacement lift: 4pers. Chairlift (fixed-grip)
All lifts

planned: Lazaun (YOC 2016)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1300 m · Carrying capacity/hour: 2400
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts
1-4 out of 4 ski resorts