Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Change lift info:

South Tyrol: planned lifts

All planned lifts in South Tyrol - Lift projects at ski resorts in South Tyrol (renewal, development and integration)


Overview: planned ski lifts in South Tyrol

Total: 5
1
4

Add lifts and cable cars? Please report here


See also:
New lifts 2015/2016



South Tyrol - expand to (number of planned ski lifts):

Map: planned ski lifts in South Tyrol

South Tyrol - limit to (number of planned ski lifts):

South Tyrol: planned ski lifts

1-3 out of 3 ski resorts

planned: Franzin (Bj. 2015)

6pers. High speed chairlift (detachable) with bubble
Length: 900 m · Carrying capacity/hour: 2000
Replacement lift: J-bar
J-bar

planned: Moseralm

6pers. High speed chairlift (detachable)
Length: 800 m · Carrying capacity/hour: 2400
All lifts

planned: Valgrande-Col d’la Tenda (Bj. 2016)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
Sesto/Helm-Rotwand-Kreuzbergpass (Kreuzbergpass)

planned: Valgrande-Popera (Bj. 2016)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
Sesto/Helm-Rotwand-Kreuzbergpass (Kreuzbergpass)
All lifts

planned: Lazaun (Bj. 2015)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1300 m · Carrying capacity/hour: 2400
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts
    1-3 out of 3 ski resorts