Italy: planned lifts

All planned lifts in Italy - Lift projects at ski resorts in Italy (renewal, development and integration)


Overview: planned ski lifts in Italy

Total: 12
1
1
4
6

Add lifts and cable cars? Please report here


See also:
New lifts 2015/2016



Italy - expand to (number of planned ski lifts):

Map: planned ski lifts in Italy

Italy - limit to (number of planned ski lifts):

Italy: planned ski lifts

1-10 out of 10 ski resorts

planned: Valgrande-Col d’la Tenda (Bj. 2016)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
Helm-Stiergarten-Rotwand-Kreuzbergpass (Kreuzbergpass)

planned: Valgrande-Popera (Bj. 2016)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
Helm-Stiergarten-Rotwand-Kreuzbergpass (Kreuzbergpass)
All lifts

planned: Franzin (Bj. 2015)

6pers. High speed chairlift (detachable) with bubble
Length: 900 m · Carrying capacity/hour: 2000
Replacement lift: J-bar
J-bar

planned: Moseralm

6pers. High speed chairlift (detachable)
Length: 800 m · Carrying capacity/hour: 2400
All lifts

planned: Folgaria-Francollini-Sommo Alto

8pers. Gondola lift (monocable circulating ropeway)
Length: 2500 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

planned: Fondo Piccolo-Sommo Alto

4pers. High speed chairlift (detachable)
Length: 1200 m · Carrying capacity/hour: 2200
Manufacturer: Leitner
All lifts

planned: Vallaccia (Bj. 2015)

8pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2000
All lifts

planned: Passo Tonale (Bj. 2016)

20pers. Funicular
Length: 250 m · Carrying capacity/hour: 500
All lifts

planned: Lazaun (Bj. 2015)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1300 m · Carrying capacity/hour: 2400
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

planned: San Domenico–Alpe Ciamporino (Bj. 2016)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1440 m · Carrying capacity/hour: 2400
Manufacturer: Bartholet BMF
Replacement lift: 2pers. Chairlift (fixed-grip)
2pers. Chairlift (fixed-grip)
All lifts

planned: Valgrande-Col d’la Tenda (Bj. 2016)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400

planned: Valgrande-Popera (Bj. 2016)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
All lifts

planned: Scavalco

100pers. Funifor - wind stable ropeway with wide rope gauge
Length: 2000 m ·
All lifts

planned: Saroden-Cima Vioz (Bj. 2015)

4pers. High speed chairlift (detachable)
Length: 1000 m · Carrying capacity/hour: 2000
All lifts
    1-10 out of 10 ski resorts