Change lift info:

Upper Bavaria: planned lifts

All planned lifts in Upper Bavaria - Lift projects at ski resorts in Upper Bavaria (renewal, development and integration)


Overview: planned ski lifts in Upper Bavaria

Total: 10
1
3
6

Add lifts and cable cars? Please report here


See also:
New lifts 2016/2017



Upper Bavaria - expand to (number of planned ski lifts):

Map: planned ski lifts in Upper Bavaria

Show map
Upper Bavaria - limit to (number of planned ski lifts):

Upper Bavaria: planned ski lifts

1-5 out of 5 ski resorts

planned: Eibseeseilbahn (YOC 2017)

120pers. Aerial tramway/Reversible ropeway
Length: 4453 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr
Replacement lift: 45pers. Aerial tramway/Reversible ropeway

planned: Weißes Tal (YOC 2017)

6pers. High speed chairlift (detachable) with bubble
Length: 1250 m · Carrying capacity/hour: 2400
Replacement lift: T-bar
All lifts

planned: Bayrischzell-Sudelfeld (YOC 2018)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1450 m · Carrying capacity/hour: 2000
Replacement lift: 1pers. Chairlift (fixed-grip)

planned: Sudelfeldkopf (YOC 2017)

8pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1320 m · Carrying capacity/hour: 3500
Replacement lift: T-bar
T-bar
All lifts

planned: Jennerbahn II (YOC 2017)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1400 m · Carrying capacity/hour: 2000
Replacement lift: 2pers. Gondola lift (monocable circulating ropeway)

planned: Jennerbahn I (YOC 2017)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1950 m · Carrying capacity/hour: 2000
Replacement lift: 2pers. Gondola lift (monocable circulating ropeway)

planned: Mitterkaserbahn (YOC 2017)

6pers. High speed chairlift (detachable) with bubble
Length: 750 m · Carrying capacity/hour: 1800
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Jennerwiese (YOC 2017)

6pers. High speed chairlift (detachable)
Length: 580 m · Carrying capacity/hour: 2000
All lifts

planned: Osthangbahn (YOC 2016)

4pers. High speed chairlift (detachable) with bubble
Length: 1500 m · Carrying capacity/hour: 2000
Replacement lift: T-bar
T-bar
All lifts

planned: Fröttmaninger Berg (YOC 2016)

4pers. Chairlift (fixed-grip)
Length: 250 m · Carrying capacity/hour: 1500
All lifts
1-5 out of 5 ski resorts