Remaining Mittelgebirge: planned lifts

All planned lifts in the Remaining Mittelgebirge - Lift projects at ski resorts in the Remaining Mittelgebirge (renewal, development and integration)


Overview: planned ski lifts in the Remaining Mittelgebirge

Total: 8
2
6

Add lifts and cable cars? Please report here


See also:
New lifts 2016/2017



Remaining Mittelgebirge - expand to (number of planned ski lifts):

Map: planned ski lifts in the Remaining Mittelgebirge

Show map
Remaining Mittelgebirge - limit to (number of planned ski lifts):

Remaining Mittelgebirge: planned ski lifts

1-5 out of 5 ski resorts

planned: Haupthangbahn (YOC 2017)

8pers. High speed chairlift (detachable)
Length: 980 m · Carrying capacity/hour: 2800
Replacement lift: T-bar
T-bar

planned: Himmelsleiterbahn (YOC 2017)

6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1120 m · Carrying capacity/hour: 2400
Replacement lift: T-bar
All lifts

planned: Käppchen (YOC 2016)

4pers. Chairlift (fixed-grip)
Length: 700 m · Carrying capacity/hour: 2000
Replacement lift: T-bar
All lifts

planned: Westfalenhang I (YOC 2016)

4pers. High speed chairlift (detachable)
Length: 650 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: T-bar
All lifts

planned: Skiarena Harz II (YOC 2016)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1350 m · Carrying capacity/hour: 2000

planned: Skiarena Harz I (YOC 2016)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1260 m · Carrying capacity/hour: 2000
All lifts

planned: Am Fellberg 2

4pers. Chairlift (fixed-grip)
Length: 900 m · Carrying capacity/hour: 2400
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Am Fellberg 1

2pers. Chairlift (fixed-grip)
Length: 600 m · Carrying capacity/hour: 1000
Replacement lift: T-bar
All lifts
1-5 out of 5 ski resorts