Ski resorts Central Uplands of Germany (Deutsche Mittelgebirge)
Change lift info:
Central Uplands of Germany (Deutsche Mittelgebirge): planned lifts
All planned lifts in the Central Uplands of Germany (Deutsche Mittelgebirge)
Overview: planned ski lifts in the Central Uplands of Germany (Deutsche Mittelgebirge)
Lift projects at ski resorts in the Central Uplands of Germany (Deutsche Mittelgebirge) (renewal, development and integration)
Total: 10
3 1 6
Add lifts and cable cars? Please report here
See also:
New lifts 2023/2024
Central Uplands of Germany (Deutsche Mittelgebirge): planned ski lifts
- Central Uplands of Germany (Deutsche Mittelgebirge) – limit to
Mountain ranges: German Ore Mountains (Deutsches Erzgebirge) (2), Bavarian Forest (Bayerische Wald) (2), Harz (2), Rothaar Mountains (Rothaargebirge) (1), Fichtel Mountains (Fichtelgebirge) (1)
Superordinate mountain systems: Thuringian-Franconian Highlands (2), Süder Uplands (Süderbergland) (1)
Central Uplands of Germany (Deutsche Mittelgebirge) – switch toCross-border mountain ranges: Sudetes (Sudety) (10), Ore Mountains (Erzgebirge) (5), Rhenish Massif (Rheinisches Schiefergebirge) (1)
1-7 out of 7 ski resorts
6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1250 m
Carrying capacity/hour: 2600
4pers. Chairlift (fixed-grip)
Length: 500 m
Carrying capacity/hour: 2400
8pers. High speed chairlift (detachable) with bubble
Length: 950 m
Carrying capacity/hour: 2800
6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1120 m
Carrying capacity/hour: 2400
10pers. Gondola lift (monocable circulating ropeway)
Length: 1824 m
Carrying capacity/hour: 2000
Manufacturer: LEITNER
10pers. Gondola lift (monocable circulating ropeway)
Length: 1260 m
Carrying capacity/hour: 2000
10pers. Gondola lift (monocable circulating ropeway)
Length: 1350 m
Carrying capacity/hour: 2000
4pers. High speed chairlift (detachable)
Length: 650 m
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Combined installation (6 pers. chair and 8 pers. gondola)
Length: 900 m
Carrying capacity/hour: 2400
2pers. Chairlift (fixed-grip)
Length: 600 m
Carrying capacity/hour: 1000
1-7 out of 7 ski resorts