Worldwide
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Worldwide » Europe » Germany
Change region
Worldwide » Europe » Germany

planned: Westfalenhang I (YOC 2013)

4pers. High speed chairlift (detachable)
Length: 650 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: T-bar

planned: Mittelstation (YOC 2014)

T-bar
Length: 1000 m · Carrying capacity/hour: 800

planned: Waldkopfbahn (YOC 2013)

6pers. High speed chairlift (detachable)
Length: 1000 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: T-bar , T-bar

planned: Weiherkopfbahn (YOC 2013)

6pers. High speed chairlift (detachable)
Length: 1100 m · Carrying capacity/hour: 2400
Replacement lift: T-bar

planned: Krautkaser (YOC 2013)

4pers. High speed chairlift (detachable) with bubble
Length: 990 m · Carrying capacity/hour: 1500
Manufacturer: Leitner
Replacement lift: T-bar

planned: Fröttmaninger Berg (YOC 2013)

4pers. Chairlift (fixed-grip)
Length: 250 m · Carrying capacity/hour: 1500

planned: Zubringerbahn (YOC 2013)

8pers. High speed chairlift (detachable)
Length: 750 m · Carrying capacity/hour: 3000
Replacement lift: T-bar , T-bar

planned: Wiedhagbahn (YOC 2013)

6pers. High speed chairlift (detachable)
Length: 1150 m · Carrying capacity/hour: 2400
Replacement lift: T-bar , T-bar

planned: Höllwies-Express

6pers. High speed chairlift (detachable)
Length: 1980 m · Carrying capacity/hour: 2600
Replacement lift: T-bar

planned: Gunzesried Express (YOC 2013)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2300 m · Carrying capacity/hour: 2400
Replacement lift: 2pers. Chairlift (fixed-grip) , T-bar

planned: Gipfel Express (YOC 2013)

6pers. High speed chairlift (detachable)
Length: 1000 m · Carrying capacity/hour: 2400
Replacement lift: T-bar

planned: Osthangbahn (YOC 2013)

4pers. High speed chairlift (detachable) with bubble
Length: 1500 m · Carrying capacity/hour: 2000
Replacement lift: T-bar , T-bar

planned: Kappe-Express

4pers. High speed chairlift (detachable)
Length: 500 m · Carrying capacity/hour: 2000
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Weißes Tal (YOC 2016)

6pers. High speed chairlift (detachable) with bubble
Length: 1250 m · Carrying capacity/hour: 2400
Replacement lift: T-bar
Test Reports
Ski Special • Tips for the ski holiday
Video
Steinplatte
Photos
Events
Hochzillertal
2013-11-30
Kitzbuehel
2014-01-24 – 2014-01-26
Lifts and Cable Cars
Arber
Live Webcam
Current Info
http://www.skiresort.info/ski-resort/arber/
With its 6 person gondola, two 6 person chair lifts, t-bar lifts, the ArBaer children's area with 4 people movers and dwarf garden, funpark, winter toboggan run with floodlights, ski rental and ski service - it is one of the most modern ski resorts in Germany more...
Trail Maps
Test Reports
Highlights
Beginners
Families and children
Highlights
Orientation (trail map, information boards, sign-postings)
Cross-country skiing and trails
Germany-Austria | Reit im Winkl/Winklmoosalm-Steinplatte
The modern high speed six-person-chair with covers, seat heating and child-proof lock replaced the oly Scheibelberg t-bar. Now you can reach the Steinplatte from the Winklmoosalm very easy. more...